Differences between revisions 168 and 446 (spanning 278 versions)
Revision 168 as of 2008-11-25 11:06:17
Size: 1309
Editor: ManuelRuiz
Comment:
Revision 446 as of 2010-10-25 14:13:19
Size: 2180
Editor: visitor2
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
AodSchedule3-08

Line 9: Line 6:
Week ; Dates ; AoD ; Comments
40;30.9.-7.10.;H.Wiesemeyer;HERA pool
41;7.10.-15.10.;F.Damour (7.-9.10.), M.Ruiz (9.-15.10.);VLBI (F.Damour can be contacted during his night shift)
42;14.10.-21.10.;R.Aladro (Tue-Fri), D.Riquelme (Fri-Tue);HERA pool (GISMO installation)
43;21.10.-28.10.;H.Ungerechts (Tue-Thu), A.Sievers (Thu-Tue);GISMO observations, TT NCS 27.-30.10.
44;28.10.-4.11.;R.Aladro (28.-31.10.), D.Riquelme (31.10.-7.11.); HERA-Pool
45;4.11.-11.11.;D.Riquelme (31.10.-7.11.), R.Aladro (7.11.-11.11.); MAMBO-Tests
46;11.11.-18.11.;B.Ocana; MAMBO-Pool
47;18.11.-25.11.;D.Riquelme; MAMBO-Pool
48;25.11.-2.12.;F.Damour (nighttime), M.Ruiz (daytime); ABCD-Calibrators, NCS/EMIR Tests: 24.-27.11.
49;2.12.-9.12.;F.Damour; (F.Damour can be contacted during his daytime shift)
50;9.12.-16.12.;J.Santiago; HERA-Pool (J.Santiago can be contacted during his nighttime shift)
51;16.12.-23.12.;B.Ocana; HERA-Pool, NCS/EMIR Tests: 15.12.-18.12.
52;23.12.-30.12.;R.Aladro;
1;30.12.-6.1.;H.Ungerechts;
2;6.1.-13.1.;G.Paubert;
3;13.1.-20.1.;H.Wiesemeyer; HERA-Pool, NCS/EMIR Tests: 12.-15.1.
4;20.1.-27.1.;D.Riquelme; HERA-Pool
5;27.1.-3.2.;;
6;3.2.-10.2.;;
7;10.2.-17.2.;;
8;17.2.-24.2.;;
9;24.2.-3.2.;;
;;;;
Week ; Dates ; AoD ; Comments;;
27;6.7.-13.7.;J.Santiago (day-time operator);;
28;13.7.-20.7.;R.Aladro;;
29;20.7.-27.7.;F.Damour & M.Ruiz (operators);;
30;27.7.-3.8.;A.Sievers (27.+28.7.), M.Gonzalez (29.7.-3.8. during day-time from Granada), J.Santiago (night-time operator);;
31;3.8.-10.8.;C.Buchbender (-12.8.); 228-09;
32;10.8.-17.8.;D.Riquelme (12.8.-17.8.) & J.Abreu (10.-16.);;
33;17.8.-24.8.;M.Gonzalez & C.Kramer;HEMT Receiver: Installation & Tests;
34;24.8.-31.8.;D.Riquelme (24.8-27-8);;
35;31.8.-7.9.;R.Aladro (27.8.-3.9.), C.Buchbender (3.9.-10.9.) & J.Abreu (3.9.-7.9.); 228-09 (7.-13.9.);
36;7.9.-14.9.;C.Buchbender (3.9.-10.9.), A.Sievers (10.9.-14.9.);;
37;14.9.-21.9.;D.Riquelme & J.Abreu (-20.9.);;
38;21.9.-28.9.;G.Quintana-Lacaci (24.-27.9.);Heavy Maintenance: Exchange of El-Gearbox+Observations;
39;28.9.-5.10.;G.Paubert (1.-5.10.);Heavy Maintenance: Exchange of Az-Gearbox+Obs.;
40;5.10.-12.10.;M.Ruiz;Global 3mm VLBI (7.-12.10.);
41;12.10.-19.10.;J.Abreu & H.Ungerechts (14.-19.10.); NIKA arrives on 14.10. ;
42;19.10.-26.10.;D.Riquelme; NIKA run + Obs.;
43;26.10.-2.11.;G.Quintana-Lacaci (25.-29.10.), C.Buchbender (29.10.-2.11.);MAMBO2 re-installation & checkout (starts on 25.10.), Poolweek;
44;2.11.-9.11.;M.Gonzalez & J.Abreu (2.-7.11.), M.Ruiz (8.-9.11., day-time operator);HERA Poolweek, HERM33ES workshop 8./9.11.;
45;9.11.-16.11.;A.Sievers;MAMBO2 Poolweek;
46;16.11.-23.11.;M.Gonzalez;HERA Poolweek;
47;23.11.-30.11.;J.Abreu;Reserve Poolweek, End of Summersemester 2010;
48;30.11.-7.12.;D.Riquelme;'''Start of winter semester 2010/11''';
49;7.12.-14.12.;G.Quintana-Lacaci; 1st MAMBO2 Poolweek;
50;14.12.-21.12.;M.Gonzalez (F.Damour, day-time-operator);1st HERA Poolweek;
51;21.12.-28.12.;D.Riquelme (F.Damour, day-time-operator);;
51;28.12.-4.1.;J.Abreu (J.Santiago, night-time-operator);restart of pools on 7.1.;
1;4.1.2011-11.1.;C.Buchbender (M.Ruiz, night-time-operator);;
Line 33: Line 36:

Old AoD Plans:
 * AodSchedule310, AodSchedule210, AodSchedule110
 * AodSchedule409, AodSchedule309, AodSchedule209, AodSchedule109
 * AodSchedule408, AodSchedule308

Week Dates AoD Comments
27 6.7.-13.7. J.Santiago (day-time operator)
28 13.7.-20.7. R.Aladro
29 20.7.-27.7. F.Damour & M.Ruiz (operators)
30 27.7.-3.8. A.Sievers (27.+28.7.), M.Gonzalez (29.7.-3.8. during day-time from Granada), J.Santiago (night-time operator)
31 3.8.-10.8. C.Buchbender (-12.8.) 228-09
32 10.8.-17.8. D.Riquelme (12.8.-17.8.) & J.Abreu (10.-16.)
33 17.8.-24.8. M.Gonzalez & C.Kramer HEMT Receiver: Installation & Tests
34 24.8.-31.8. D.Riquelme (24.8-27-8)
35 31.8.-7.9. R.Aladro (27.8.-3.9.), C.Buchbender (3.9.-10.9.) & J.Abreu (3.9.-7.9.) 228-09 (7.-13.9.)
36 7.9.-14.9. C.Buchbender (3.9.-10.9.), A.Sievers (10.9.-14.9.)
37 14.9.-21.9. D.Riquelme & J.Abreu (-20.9.)
38 21.9.-28.9. G.Quintana-Lacaci (24.-27.9.) Heavy Maintenance: Exchange of El-Gearbox+Observations
39 28.9.-5.10. G.Paubert (1.-5.10.) Heavy Maintenance: Exchange of Az-Gearbox+Obs.
40 5.10.-12.10. M.Ruiz Global 3mm VLBI (7.-12.10.)
41 12.10.-19.10. J.Abreu & H.Ungerechts (14.-19.10.) NIKA arrives on 14.10.
42 19.10.-26.10. D.Riquelme NIKA run + Obs.
43 26.10.-2.11. G.Quintana-Lacaci (25.-29.10.), C.Buchbender (29.10.-2.11.) MAMBO2 re-installation & checkout (starts on 25.10.), Poolweek
44 2.11.-9.11. M.Gonzalez & J.Abreu (2.-7.11.), M.Ruiz (8.-9.11., day-time operator) HERA Poolweek, HERM33ES workshop 8./9.11.
45 9.11.-16.11. A.Sievers MAMBO2 Poolweek
46 16.11.-23.11. M.Gonzalez HERA Poolweek
47 23.11.-30.11. J.Abreu Reserve Poolweek, End of Summersemester 2010
48 30.11.-7.12. D.Riquelme '''Start of winter semester 2010/11'''
49 7.12.-14.12. G.Quintana-Lacaci 1st MAMBO2 Poolweek
50 14.12.-21.12. M.Gonzalez (F.Damour, day-time-operator) 1st HERA Poolweek
51 21.12.-28.12. D.Riquelme (F.Damour, day-time-operator)
51 28.12.-4.1. J.Abreu (J.Santiago, night-time-operator) restart of pools on 7.1.
1 4.1.2011-11.1. C.Buchbender (M.Ruiz, night-time-operator)

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)