|
Size: 1309
Comment:
|
Size: 2180
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 4: | Line 4: |
| AodSchedule3-08 |
|
| Line 9: | Line 6: |
| Week ; Dates ; AoD ; Comments 40;30.9.-7.10.;H.Wiesemeyer;HERA pool 41;7.10.-15.10.;F.Damour (7.-9.10.), M.Ruiz (9.-15.10.);VLBI (F.Damour can be contacted during his night shift) 42;14.10.-21.10.;R.Aladro (Tue-Fri), D.Riquelme (Fri-Tue);HERA pool (GISMO installation) 43;21.10.-28.10.;H.Ungerechts (Tue-Thu), A.Sievers (Thu-Tue);GISMO observations, TT NCS 27.-30.10. 44;28.10.-4.11.;R.Aladro (28.-31.10.), D.Riquelme (31.10.-7.11.); HERA-Pool 45;4.11.-11.11.;D.Riquelme (31.10.-7.11.), R.Aladro (7.11.-11.11.); MAMBO-Tests 46;11.11.-18.11.;B.Ocana; MAMBO-Pool 47;18.11.-25.11.;D.Riquelme; MAMBO-Pool 48;25.11.-2.12.;F.Damour (nighttime), M.Ruiz (daytime); ABCD-Calibrators, NCS/EMIR Tests: 24.-27.11. 49;2.12.-9.12.;F.Damour; (F.Damour can be contacted during his daytime shift) 50;9.12.-16.12.;J.Santiago; HERA-Pool (J.Santiago can be contacted during his nighttime shift) 51;16.12.-23.12.;B.Ocana; HERA-Pool, NCS/EMIR Tests: 15.12.-18.12. 52;23.12.-30.12.;R.Aladro; 1;30.12.-6.1.;H.Ungerechts; 2;6.1.-13.1.;G.Paubert; 3;13.1.-20.1.;H.Wiesemeyer; HERA-Pool, NCS/EMIR Tests: 12.-15.1. 4;20.1.-27.1.;D.Riquelme; HERA-Pool 5;27.1.-3.2.;; 6;3.2.-10.2.;; 7;10.2.-17.2.;; 8;17.2.-24.2.;; 9;24.2.-3.2.;; |
;;;; Week ; Dates ; AoD ; Comments;; 27;6.7.-13.7.;J.Santiago (day-time operator);; 28;13.7.-20.7.;R.Aladro;; 29;20.7.-27.7.;F.Damour & M.Ruiz (operators);; 30;27.7.-3.8.;A.Sievers (27.+28.7.), M.Gonzalez (29.7.-3.8. during day-time from Granada), J.Santiago (night-time operator);; 31;3.8.-10.8.;C.Buchbender (-12.8.); 228-09; 32;10.8.-17.8.;D.Riquelme (12.8.-17.8.) & J.Abreu (10.-16.);; 33;17.8.-24.8.;M.Gonzalez & C.Kramer;HEMT Receiver: Installation & Tests; 34;24.8.-31.8.;D.Riquelme (24.8-27-8);; 35;31.8.-7.9.;R.Aladro (27.8.-3.9.), C.Buchbender (3.9.-10.9.) & J.Abreu (3.9.-7.9.); 228-09 (7.-13.9.); 36;7.9.-14.9.;C.Buchbender (3.9.-10.9.), A.Sievers (10.9.-14.9.);; 37;14.9.-21.9.;D.Riquelme & J.Abreu (-20.9.);; 38;21.9.-28.9.;G.Quintana-Lacaci (24.-27.9.);Heavy Maintenance: Exchange of El-Gearbox+Observations; 39;28.9.-5.10.;G.Paubert (1.-5.10.);Heavy Maintenance: Exchange of Az-Gearbox+Obs.; 40;5.10.-12.10.;M.Ruiz;Global 3mm VLBI (7.-12.10.); 41;12.10.-19.10.;J.Abreu & H.Ungerechts (14.-19.10.); NIKA arrives on 14.10. ; 42;19.10.-26.10.;D.Riquelme; NIKA run + Obs.; 43;26.10.-2.11.;G.Quintana-Lacaci (25.-29.10.), C.Buchbender (29.10.-2.11.);MAMBO2 re-installation & checkout (starts on 25.10.), Poolweek; 44;2.11.-9.11.;M.Gonzalez & J.Abreu (2.-7.11.), M.Ruiz (8.-9.11., day-time operator);HERA Poolweek, HERM33ES workshop 8./9.11.; 45;9.11.-16.11.;A.Sievers;MAMBO2 Poolweek; 46;16.11.-23.11.;M.Gonzalez;HERA Poolweek; 47;23.11.-30.11.;J.Abreu;Reserve Poolweek, End of Summersemester 2010; 48;30.11.-7.12.;D.Riquelme;'''Start of winter semester 2010/11'''; 49;7.12.-14.12.;G.Quintana-Lacaci; 1st MAMBO2 Poolweek; 50;14.12.-21.12.;M.Gonzalez (F.Damour, day-time-operator);1st HERA Poolweek; 51;21.12.-28.12.;D.Riquelme (F.Damour, day-time-operator);; 51;28.12.-4.1.;J.Abreu (J.Santiago, night-time-operator);restart of pools on 7.1.; 1;4.1.2011-11.1.;C.Buchbender (M.Ruiz, night-time-operator);; |
| Line 33: | Line 36: |
Old AoD Plans: * AodSchedule310, AodSchedule210, AodSchedule110 * AodSchedule409, AodSchedule309, AodSchedule209, AodSchedule109 * AodSchedule408, AodSchedule308 |
