Differences between revisions 160 and 161
Revision 160 as of 2008-10-07 15:37:10
Size: 1035
Editor: visitor7
Comment:
Revision 161 as of 2008-10-09 13:42:57
Size: 1045
Editor: visitor7
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
44;28.10.-4.11.;R.Aladro; 44;28.10.-4.11.;R.Aladro; HERA-Pool

AodSchedule3-08

Week Dates AoD Comments
40 30.9.-7.10. H.Wiesemeyer HERA pool
41 7.10.-15.10. F.Damour (7.-9.10.), M.Ruiz (9.-15.10.) VLBI (F.Damour can be contacted during his night shift)
42 14.10.-21.10. R.Aladro (Tue-Fri), D.Riquelme (Fri-Tue) HERA pool (GISMO installation)
43 21.10.-28.10. H.Ungerechts (Tue-Thu), A.Sievers (Thu-Tue) GISMO observations, TT NCS 27.-30.10.
44 28.10.-4.11. R.Aladro HERA-Pool
45 4.11.-11.11. D.Riquelme MAMBO-Tests
46 11.11.-18.11. B.Ocana MAMBO-Pool
47 18.11.-25.11. D.Riquelme
48 25.11.-2.12. F.Damour (daytime), M.Ruiz (nighttime) ABCD-Calibrators, NCS/EMIR Tests: 24.-27.11.
49 2.12.-9.12. F.Damour (F.Damour can be contacted during his daytime shift)
50 9.12.-16.12. J.Santiago (J.Santiago can be contacted during his nighttime shift)
51 16.12.-23.12. B.Ocana NCS/EMIR Tests: 15.12.-18.12.
52 23.12.-30.12. R.Aladro
1 30.12.-6.1. H.Ungerechts
2 6.1.-13.1.
3 13.1.-20.1. NCS/EMIR Tests: 12.-15.1.

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)