Size: 1964
Comment:
|
Size: 1293
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
{{{ #!CSV Week ; Dates ; AoD ; Comments 23;3.6.-10.6.;Ungerechts (Tue-Fri), Aladro (Fri-Tue); 24;10.6.-17.6.;Paubert;; 25;17.6.-24.6.; Leon(Thu-Tue); Tue-Thu: heavy maintenance 26;24.6.-1.7.;Ungerechts (Tue-Fri), Aladro (Fri-Tue); Ungerechts can be contacted by phone 27;1.7.-8.7.;Damour (Tue-Fri), Riquelme (Fri-Tue); Damour can be contacted during his night operator shift 28;8.7.-15.7.;Ocana; 29;15.7.-22.7.;Aladro (Tue-Fri), Riquelme (Fri-Tue); 30;22.7.-29.7.;Damour/ Ruiz; can be contacted during their operator shifts 31;29.7.-5.8.; Wiesemeyer (Tue-Fri), Aladro (Fri-Tue); 32;5.8.-12.8.;Ocana; 33;12.8.-19.8.;Aladro; 34;19.8.-26.8.;Ocana; 35;26.8.-2.9.;M.Ruiz; can be contacted during his night operator shift 36;2.9.-9.9.;F.Damour; can be contacted during his night operator shift 37;9.9.-16.9.;D.Riquelme (Tue-Fri) & R.Aladro (Fri-Tue); 38;16.9.-23.9.;B.Ocana (Tue-Fri), R.Aladro (Fri-Tue); previously S.Leon 39;23.9.-30.9.;Ungerechts; }}} |
|
Line 35: | Line 14: |
44;28.10.-4.11.;R.Aladro; 45;4.11.-11.11.;D.Riquelme; 46;11.11.-18.11.;G.Paubert; 47;18.11.-25.11.;D.Riquelme; 48;25.11.-2.12.;F.Damour (daytime), M.Ruiz (nighttime); NCS/EMIR Tests: 24.-27.11. |
44;28.10.-4.11.;R.Aladro (28.-31.10.), D.Riquelme (31.10.-7.11.); HERA-Pool 45;4.11.-11.11.;D.Riquelme (31.10.-7.11.), R.Aladro (7.11.-11.11.); MAMBO-Tests 46;11.11.-18.11.;B.Ocana; MAMBO-Pool 47;18.11.-25.11.;D.Riquelme; MAMBO-Pool 48;25.11.-2.12.;F.Damour (daytime), M.Ruiz (nighttime); ABCD-Calibrators, NCS/EMIR Tests: 24.-27.11. |
Line 41: | Line 20: |
50;9.12.-16.12.;J.Santiago; (J.Santiago can be contacted during his nighttime shift) 51;16.12.-23.12.;B.Ocana; NCS/EMIR Tests: 15.12.-18.12. |
50;9.12.-16.12.;J.Santiago; HERA-Pool (J.Santiago can be contacted during his nighttime shift) 51;16.12.-23.12.;B.Ocana; HERA-Pool, NCS/EMIR Tests: 15.12.-18.12. |
Line 44: | Line 23: |
1;30.12.-6.1.;H.Ungerechts; 2;6.1.-13.1.;; 3;13.1.-20.1.;; NCS/EMIR Tests: 12.-15.1. |
1;30.12.-6.1.;H.Ungerechts; 2;6.1.-13.1.;G.Paubert TBC; 3;13.1.-20.1.;H.Wiesemeyer; HERA-Pool, NCS/EMIR Tests: 12.-15.1. 4;20.1.-27.1.;; 5;27.1.-3.2.;; 6;3.2.-10.2.;; 7;10.2.-17.2.;; 8;17.2.-24.2.;; 9;24.2.-3.2.;; |
AodSchedule3-08