Differences between revisions 149 and 1023 (spanning 874 versions)
Revision 149 as of 2008-09-27 09:36:39
Size: 1877
Editor: visitor7
Comment:
Revision 1023 as of 2017-01-12 07:56:04
Size: 1616
Editor: PabloMellado
Comment: Notifications are not working
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
##language:en ## page was renamed from AstronomerOnDutySchedule
#language:en
Line 3: Line 4:

= 2017 =
Line 5: Line 9:
Week ; Dates ; AoD ; Comments
23;3.6.-10.6.;Ungerechts (Tue-Fri), Aladro (Fri-Tue);
24;10.6.-17.6.;Paubert;;
25;17.6.-24.6.; Leon(Thu-Tue); Tue-Thu: heavy maintenance
26;24.6.-1.7.;Ungerechts (Tue-Fri), Aladro (Fri-Tue); Ungerechts can be contacted by phone
27;1.7.-8.7.;Damour (Tue-Fri), Riquelme (Fri-Tue); Damour can be contacted during his night operator shift
28;8.7.-15.7.;Ocana;
29;15.7.-22.7.;Aladro (Tue-Fri), Riquelme (Fri-Tue);
30;22.7.-29.7.;Damour/ Ruiz; can be contacted during their operator shifts
31;29.7.-5.8.; Wiesemeyer (Tue-Fri), Aladro (Fri-Tue);
32;5.8.-12.8.;Ocana;
33;12.8.-19.8.;Aladro;
34;19.8.-26.8.;Ocana;
35;26.8.-2.9.;M.Ruiz; can be contacted during his night operator shift
36;2.9.-9.9.;F.Damour; can be contacted during his night operator shift
37;9.9.-16.9.;D.Riquelme (Tue-Fri) & R.Aladro (Fri-Tue);
38;16.9.-23.9.;B.Ocana (Tue-Fri), R.Aladro (Fri-Tue); previously S.Leon
39;23.9.-30.9.;Ungerechts;
40;30.9.-7.10.;H.Wiesemeyer;HERA pool
41;7.10.-15.10.;F.Damour (7.-9.10.), M.Ruiz (9.-15.10.);VLBI (F.Damour can be contacted during his night shift)
42;14.10.-21.10.;R.Aladro (Tue-Fri), D.Riquelme (Fri-Tue);HERA pool (GISMO installation)
43;21.10.-28.10.;H.Ungerechts (Tue-Thu), A.Sievers (Thu-Tue);GISMO observations, TT NCS 27.-30.10.
44;28.10.-4.11.;;
45;4.11.-11.11.;D.Riquelme;
46;11.11.-18.11.;B.Ocana;
47;18.11.-25.11.;D.Riquelme;
48;25.11.-2.12.;F.Damour (daytime), M.Ruiz (nighttime); NCS/EMIR Tests: 24.-27.11.
49;2.12.-9.12.;F.Damour; (F.Damour can be contacted during his daytime shift)
50;9.12.-16.12.;Joaquin; (Joaquin can be contacted during his nighttime shift)
51;16.12.-23.12.;B.Ocana; NCS/EMIR Tests: 15.12.-18.12.
52;23.12.-30.12.;R.Aladro;
1;30.12.-6.1.;H.Ungerechts;
2;6.1.-13.1.;;
3;13.1.-20.1.;; NCS/EMIR Tests: 12.-15.1.
;;;;
1; 3.-10.1.; P.Torne; Heterodyne Pool Week;
2; 10.-17.1.; G.Paubert (remote from Granada);;
3; 17.-24.1.; A.Sievers; Switch from mira to mrt-cal, 20.1.: 0.8mm VLBI test slot;
4; 24.-31.1.; P.Garcia; 6hours NIKA2 slot, possible 4hours 1mm VLBI slots;
5; 31.1.-7.2.; C.Marka; Heterodyne Pool Week #2, possible 4hours 1mm VLBI test slot;
6; 7.-14.2.; H.Ungerechts (remote from Granada); 10.2.: 0.8mm VLBI test slot;
7; 14.-21.2.; P.Torne; 15.2.: 0.8mm VLBI test slot;
8; 21.-28.2.; P.Garcia / A.Ritacco; NIKA2 commissioning week;
9; 28.2.-7.3.;G.Paubert (remote from Granada);;
10; 7.-14.3.;C.Marka/ A.Ritacco; 11.-13.3. A.Maury+Students;
11; 14.-21.3.;A.Sievers (remote from Granada); 16.3. IRAM Proposal Deadline;
12; 21.-28.3.;P.Garcia;;
13; 28.3.-4.4.; P.Torne; 30.3.-4.4. VLBI/GMVA 3mm Session;
14; 4.-11.4.; C.Marka / A.Ritacco; 5.-14.4.: VLBI/EHT 1mm Session and Pool;
15; 11.-18.4.; P.Torne; 5.-14.4.: VLBI/EHT 1mm Session and Pool;
16; 18.-25.4.;;;
17; 25.4.-2.5.;;;
18; 2.-9.5.;;;
19; 9.-16.5.;;;
20; 16.-23.5.;;;
21; 23.-30.5.;; End of winter semester W16;
22; 30.5.-6.6.;;;
Line 40: Line 33:

Old AoD Plans:
 * AodSchedule16
 * AodSchedule15
 * AodSchedule14
 * AodSchedule13
 * AodSchedule112, AodSchedule212, AodSchedule3412
 * AodSchedule411, AodSchedule311, AodSchedule211, AodSchedule111
 * AodSchedule410, AodSchedule310, AodSchedule210, AodSchedule110
 * AodSchedule409, AodSchedule309, AodSchedule209, AodSchedule109
 * AodSchedule408, AodSchedule308

2017

1 3.-10.1. P.Torne Heterodyne Pool Week
2 10.-17.1. G.Paubert (remote from Granada)
3 17.-24.1. A.Sievers Switch from mira to mrt-cal, 20.1.: 0.8mm VLBI test slot
4 24.-31.1. P.Garcia 6hours NIKA2 slot, possible 4hours 1mm VLBI slots
5 31.1.-7.2. C.Marka Heterodyne Pool Week #2, possible 4hours 1mm VLBI test slot
6 7.-14.2. H.Ungerechts (remote from Granada) 10.2.: 0.8mm VLBI test slot
7 14.-21.2. P.Torne 15.2.: 0.8mm VLBI test slot
8 21.-28.2. P.Garcia / A.Ritacco NIKA2 commissioning week
9 28.2.-7.3. G.Paubert (remote from Granada)
10 7.-14.3. C.Marka/ A.Ritacco 11.-13.3. A.Maury+Students
11 14.-21.3. A.Sievers (remote from Granada) 16.3. IRAM Proposal Deadline
12 21.-28.3. P.Garcia
13 28.3.-4.4. P.Torne 30.3.-4.4. VLBI/GMVA 3mm Session
14 4.-11.4. C.Marka / A.Ritacco 5.-14.4.: VLBI/EHT 1mm Session and Pool
15 11.-18.4. P.Torne 5.-14.4.: VLBI/EHT 1mm Session and Pool
16 18.-25.4.
17 25.4.-2.5.
18 2.-9.5.
19 9.-16.5.
20 16.-23.5.
21 23.-30.5. End of winter semester W16
22 30.5.-6.6.

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)