Size: 1219
Comment:
|
Size: 1616
Comment: Notifications are not working
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
##language:en | ## page was renamed from AstronomerOnDutySchedule #language:en |
Line 3: | Line 4: |
= 2017 = |
|
Line 5: | Line 9: |
Week ; Dates ; AoD ; Comments 23;3.6.-10.6.;Ungerechts (Tue-Fri), Aladro (Fri-Tue); 24;10.6.-17.6.;Paubert;; 25;17.6.-24.6.; Leon(Thu-Tue); Tue-Thu: heavy maintenance 26;24.6.-1.7.;Ungerechts (Tue-Fri), Aladro (Fri-Tue); Ungerechts can be contacted by phone 27;1.7.-8.7.;Damour (Tue-Fri), Riquelme (Fri-Tue); Damour can be contacted during his night operator shift 28;8.7.-15.7.;Ocana; 29;15.7.-22.7.;Aladro (Tue-Fri), Riquelme (Fri-Tue); 30;22.7.-29.7.;Damour/ Ruiz; can be contacted during their operator shifts 31;29.7.-5.8.; Wiesemeyer (Tue-Fri), Aladro (Fri-Tue); 32;5.8.-12.8.;Ocana; 33;12.8.-19.8.;Aladro; 34;19.8.-26.8.;Ocana; 35;26.8.-2.9.;Ruiz; can be contacted during his night operator shift 36;2.9.-9.9.;Damour; can be contacted during his night operator shift 37;9.9.-16.9.;Riquelme (Tue-Fri) & Aladro (Fri-Tue); 38;16.9.-23.9.;B.Ocana (Tue-Fri), R.Aladro (Fri-Tue); previously S.Leon 39;23.9.-30.9.;Ungerechts; 40;30.9.-7.10.;H.Wiesemeyer;HERA pool 41;7.10.-14.10.;M.Ruiz;VLBI 42;14.10.-21.10.;R.Aladro (Tue-Fri), D.Riquelme (Fri-Tue);HERA pool 43;21.10.-28.10.;???;GISMO (M.Ruiz can be contacted during his night shift) |
;;;; 1; 3.-10.1.; P.Torne; Heterodyne Pool Week; 2; 10.-17.1.; G.Paubert (remote from Granada);; 3; 17.-24.1.; A.Sievers; Switch from mira to mrt-cal, 20.1.: 0.8mm VLBI test slot; 4; 24.-31.1.; P.Garcia; 6hours NIKA2 slot, possible 4hours 1mm VLBI slots; 5; 31.1.-7.2.; C.Marka; Heterodyne Pool Week #2, possible 4hours 1mm VLBI test slot; 6; 7.-14.2.; H.Ungerechts (remote from Granada); 10.2.: 0.8mm VLBI test slot; 7; 14.-21.2.; P.Torne; 15.2.: 0.8mm VLBI test slot; 8; 21.-28.2.; P.Garcia / A.Ritacco; NIKA2 commissioning week; 9; 28.2.-7.3.;G.Paubert (remote from Granada);; 10; 7.-14.3.;C.Marka/ A.Ritacco; 11.-13.3. A.Maury+Students; 11; 14.-21.3.;A.Sievers (remote from Granada); 16.3. IRAM Proposal Deadline; 12; 21.-28.3.;P.Garcia;; 13; 28.3.-4.4.; P.Torne; 30.3.-4.4. VLBI/GMVA 3mm Session; 14; 4.-11.4.; C.Marka / A.Ritacco; 5.-14.4.: VLBI/EHT 1mm Session and Pool; 15; 11.-18.4.; P.Torne; 5.-14.4.: VLBI/EHT 1mm Session and Pool; 16; 18.-25.4.;;; 17; 25.4.-2.5.;;; 18; 2.-9.5.;;; 19; 9.-16.5.;;; 20; 16.-23.5.;;; 21; 23.-30.5.;; End of winter semester W16; 22; 30.5.-6.6.;;; |
Line 28: | Line 33: |
Old AoD Plans: * AodSchedule16 * AodSchedule15 * AodSchedule14 * AodSchedule13 * AodSchedule112, AodSchedule212, AodSchedule3412 * AodSchedule411, AodSchedule311, AodSchedule211, AodSchedule111 * AodSchedule410, AodSchedule310, AodSchedule210, AodSchedule110 * AodSchedule409, AodSchedule309, AodSchedule209, AodSchedule109 * AodSchedule408, AodSchedule308 |