Differences between revisions 125 and 1006 (spanning 881 versions)
Revision 125 as of 2008-08-28 16:01:48
Size: 1099
Editor: visitor9
Comment:
Revision 1006 as of 2017-01-08 09:00:00
Size: 1279
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:

= 2017 =
Line 5: Line 8:
Week ; Dates ; AoD ; Comments
23;3.6.-10.6.;Ungerechts (Tue-Fri), Aladro (Fri-Tue);
24;10.6.-17.6.;Paubert;;
25;17.6.-24.6.; Leon(Thu-Tue); Tue-Thu: heavy maintenance
26;24.6.-1.7.;Ungerechts (Tue-Fri), Aladro (Fri-Tue); Ungerechts can be contacted by phone
27;1.7.-8.7.;Damour (Tue-Fri), Riquelme (Fri-Tue); Damour can be contacted during his night operator shift
28;8.7.-15.7.;Ocana;
29;15.7.-22.7.;Aladro (Tue-Fri), Riquelme (Fri-Tue);
30;22.7.-29.7.;Damour/ Ruiz; can be contacted during their operator shifts
31;29.7.-5.8.; Wiesemeyer (Tue-Fri), Aladro (Fri-Tue);
32;5.8.-12.8.;Ocana;
33;12.8.-19.8.;Aladro;
34;19.8.-26.8.;Ocana;
35;26.8.-2.9.;Ruiz; can be contacted during his night operator shift
36;2.9.-9.9.;Damour; can be contacted during his night operator shift
37;9.9.-16.9.;Riquelme;
38;16.9.-23.9.;Leon ;
39;23.9.-30.9.;Ungerechts;
40;30.9.-7.10.;H.Wiesemeyer;HERA pool
41;7.10.-14.10.;Manolo;VLBI
42/1;14.10.-17.10.;Rebecca;HERA pool
42/2;17.10.-21.10.;Denise;HERA pool
43;21.10.-28.10.;???;GISMO
;;;;
1; 3.-10.1.; P.Torne; Heterodyne Pool Week;
2; 10.-17.1.; G.Paubert (remote from Granada);;
3; 17.-24.1.; A.Sievers; Switch from mira to met-cal, 20.1.: 0.8mm VLBI test slot;
4; 24.-31.1.; P.Garcia; NIKA2 commissioning week, 1mm VLBI test slots ??;
5; 31.1.-7.2.; C.Marka; Heterodyne Pool Week #2, 1mm VLBI test slots ??;
6; 7.-14.2.; H.Ungerechts (remote from Granada);;
7; 14.-21.2.;;;
8; 21.-28.2.;;;
9; 28.2.-7.3.;;;
10; 7.-14.3.;; 11.-13.3. A.Maury+Students;
11; 14.-21.3.;; 16.3. IRAM Proposal Deadline;
12; 21.28.3.;;;
13; 28.3.-4.4.;; 30.3.-4.4. VLBI/GMVA 3mm Session;
14; 4.-11.4.;; 5.-14.4.: VLBI/EHT 1mm Session mixed with non-VLBI programs;
15; 11.-18.4.;;;
16; 18.-25.4.;;;
17; 25.4.-2.5.;;;
18; 2.-9.5.;;;
19; 9.-16.5.;;;
20; 16.-23.5.;;;
21; 23.-30.5.;; End of winter semester W16;
}}}
Line 29: Line 32:
}}} Old AoD Plans:
 * AodSchedule16
 * AodSchedule15
 * AodSchedule14
 * AodSchedule13
 * AodSchedule112, AodSchedule212, AodSchedule3412
 * AodSchedule411, AodSchedule311, AodSchedule211, AodSchedule111
 * AodSchedule410, AodSchedule310, AodSchedule210, AodSchedule110
 * AodSchedule409, AodSchedule309, AodSchedule209, AodSchedule109
 * AodSchedule408, AodSchedule308

2017

1 3.-10.1. P.Torne Heterodyne Pool Week
2 10.-17.1. G.Paubert (remote from Granada)
3 17.-24.1. A.Sievers Switch from mira to met-cal, 20.1.: 0.8mm VLBI test slot
4 24.-31.1. P.Garcia NIKA2 commissioning week, 1mm VLBI test slots ??
5 31.1.-7.2. C.Marka Heterodyne Pool Week #2, 1mm VLBI test slots ??
6 7.-14.2. H.Ungerechts (remote from Granada)
7 14.-21.2.
8 21.-28.2.
9 28.2.-7.3.
10 7.-14.3. 11.-13.3. A.Maury+Students
11 14.-21.3. 16.3. IRAM Proposal Deadline
12 21.28.3.
13 28.3.-4.4. 30.3.-4.4. VLBI/GMVA 3mm Session
14 4.-11.4. 5.-14.4.: VLBI/EHT 1mm Session mixed with non-VLBI programs
15 11.-18.4.
16 18.-25.4.
17 25.4.-2.5.
18 2.-9.5.
19 9.-16.5.
20 16.-23.5.
21 23.-30.5. End of winter semester W16

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)