|
Size: 926
Comment:
|
Size: 714
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 3: | Line 3: |
= 2017 = |
|
| Line 5: | Line 8: |
| Week ; Dates ; AoD ; Comments 23;3.6.-10.6.;Ungerechts (Tue-Fri), Aladro (Fri-Tue); 24;10.6.-17.6.;Paubert;; 25;17.6.-24.6.; Leon(Thu-Tue); Tue-Thu: heavy maintenance 26;24.6.-1.7.;Ungerechts (Tue-Fri), Aladro (Fri-Tue); Ungerechts can be contacted by phone 27;1.7.-8.7.;Damour (Tue-Fri), Riquelme (Fri-Tue); Damour can be contacted during his night operator shift 28;8.7.-15.7.;Ocana; 29;15.7.-22.7.;Aladro (Tue-Fri), Riquelme (Fri-Tue); 30;22.7.-29.7.;Damour/ Ruiz; can be contacted during their operator shifts 31;29.7.-5.8.; Wiesemeyer (Tue-Fri), Aladro (Fri-Tue); 32;5.8.-12.8.;Ocana; 33;12.8.-19.8.;Aladro; 34;19.8.-26.8.;Ocana; 35;26.8.-2.9.;Ruiz; can be contacted during his night operator shift 36;2.9.-9.9.;Damour; can be contacted during his night operator shift 37;9.9.-16.9.;Riquelme; 38;16.9.-23.9.;Leon ; 39;23.9.-30.9.;Ungerechts; |
;;;; 1; 3.-10.1.; P.Torne; Heterodyne Pool Week, 4./5. 0.8mm VLBI 30m-NOEMA test slot; 2; 10.-17.1.; H.Ungerechts (remote from Granada);; 3; 17.-24.1.; A.Sievers; Switch to mrt-cal ?; 4; 24.-31.1.; P.Garcia; NIKA2 commissioning week ?; 5; 31.1.-7.2.;;; |
| Line 24: | Line 15: |
Old AoD Plans: * AodSchedule16 * AodSchedule15 * AodSchedule14 * AodSchedule13 * AodSchedule112, AodSchedule212, AodSchedule3412 * AodSchedule411, AodSchedule311, AodSchedule211, AodSchedule111 * AodSchedule410, AodSchedule310, AodSchedule210, AodSchedule110 * AodSchedule409, AodSchedule309, AodSchedule209, AodSchedule109 * AodSchedule408, AodSchedule308 |
