Size: 1534
Comment:
|
Size: 1547
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 11: | Line 11: |
3; 17.-24.1.; A.Sievers; Switch from mira to met-cal, 20.1.: 0.8mm VLBI test slot; 4; 24.-31.1.; P.Garcia; NIKA2 commissioning week, 1mm VLBI test slots ??; 5; 31.1.-7.2.; C.Marka; Heterodyne Pool Week #2, 1mm VLBI test slots ??; |
3; 17.-24.1.; A.Sievers; Switch from mira to mrt-cal, 20.1.: 0.8mm VLBI test slot; 4; 24.-31.1.; P.Garcia; 6hours NIKA2 slot, possible 4hours 1mm VLBI slots; 5; 31.1.-7.2.; C.Marka; Heterodyne Pool Week #2, possible 4hours 1mm VLBI test slot; |