Differences between revisions 1002 and 1003
Revision 1002 as of 2016-12-02 09:10:28
Size: 1218
Comment:
Revision 1003 as of 2016-12-07 10:18:41
Size: 1219
Comment:
Deletions are marked like this. Additions are marked like this.
Line 13: Line 13:
5; 31.1.-7.2.; C.Marka; Heterdyne Pool Week #2, 1mm VLBI test slots ??; 5; 31.1.-7.2.; C.Marka; Heterodyne Pool Week #2, 1mm VLBI test slots ??;

2017

1 3.-10.1. P.Torne Heterodyne Pool Week, 4./5. 0.8mm VLBI 30m-NOEMA test slot
2 10.-17.1. H.Ungerechts (remote from Granada)
3 17.-24.1. A.Sievers Switch from mira to mrt-cal
4 24.-31.1. P.Garcia NIKA2 commissioning week, 1mm VLBI test slots ??
5 31.1.-7.2. C.Marka Heterodyne Pool Week #2, 1mm VLBI test slots ??
6 7.-14.2.
7 14.-21.2.
8 21.-28.2.
9 28.2.-7.3.
10 7.-14.3. 11.-13.3. A.Maury+Students
11 14.-21.3. 16.3. IRAM Proposal Deadline
12 21.28.3.
13 28.3.-4.4. 30.3.-4.4. VLBI/GMVA 3mm Session
14 4.-11.4. VLBI/EHT 1mm Session ?
15 11.-18.4.
16 18.-25.4.
17 25.4.-2.5.
18 2.-9.5.
19 9.-16.5.
20 16.-23.5.
21 23.-30.5. End of winter semester W16

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)