Size: 748
Comment:
|
Size: 3182
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
{{{#!CSV Week ; Dates ; AoD ; Comments 40 ; 4.10.-11.10.2005 ; Martin (Tue-Fri),Sievers (Fri-Tue) ; Summerschool till Friday, Martin can be contacted at summerschool. 41 ; 11.10.-18.10. ; Ruiz ; Ruiz can be contacted during his shift, VLBI Thu-Tue. 42 ; 18.10.-25.10. ; Marcelino (Tue-Fri),Leon (Fri-Tue) ; Fri-Tue: Pool. 43 ; 25.10.-1.11. ; Leon ; Pool. 44 ; 1.11.-8.11. ; Martin ; Pool (during the night). Coordinator: Leon (Granada). During day: NCS work 45 ; 8.11.-15.11. ; Leon;Pool (during the night), during day: NCS work 46 ; 15.11.-22.11. ; Ungerechts (Tue-Fri) ; 47 ; 22.11.-29.11. ; ; 48 ; 29.11.-6.12. ; ; 49 ; 6.12.-13.12. ; ; 50 ; 13.12.-20.12. ; ; 51 ; 20.12.-27.12. ; ; 52 ; 27.12.05-3.1.2006 ; ; |
##language:en #pragma section-numbers off {{{ #!CSV ;;;; 1; 30.12.-6.1.; I.Hermelo;; 2; 6.-13.1.; C.Marka; Heterodyne Pool ; 3; 13.-20.1.; G.Paubert; Heterodyne Pool (1x24h-Holo: Thu/Fri or Mon/Tue ?); 4; 20.-27.1.; M.Ruiz & I.Ruiz (Operators), I. Hermelo (23.-26.1); NIKA prep. time (T21, 23-25.2.); 5; 27.1.-3.2.; N.Billot; NIKA Pool; 6; 3.-10.2.; I.Hermelo; NIKA Pool; 7; 10.-17.2.; A.Sievers; NIKA Polarimetry test run; 8; 17.-24.2.; N.Billot;; 9; 24.2.-3.3.; I.Hermelo; GISMO Pool; 10; 3.-10.3.; G.Paubert; Pulsar observations; 11; 10.-17.3.; C.Marka; IRAM Deadline on 12-Mar; 12; 17.-24.3.; I.Hermelo; Heterodyne Pool (flexible 1mm VLBI); 13; 24.-31.3.; C.Marka; Heterodyne Pool(flexible 1mm VLBI); 14; 31.3.-7.4.; H.Ungerechts (from Granada);; 15; 7.-14.4.; G.Paubert (from Granada); Installation of new optics; 16; 14.-21.4.; A.Sievers; Technical & on-sky commissioning, Granada: PC Meeting on 14/15.4. + 30m visit (16.4.); 17; 21.-28.4.; C.Marka; Astronomical commissioning + flexible & internal pool observations; 18; 28.4.-5.5.; I.Hermelo;; 19; 5.-12.5.; N.Billot;; 20; 12.-19.5.; G.Paubert (partially from Granada); 14-May: Visit of 20 students from Nijmegen; 21; 19.-26.5.; C.Kramer (19.-22.5.), F.Damour/J.Santiago (Operators, 22.-26.5.); Holography 18.-22.5.; 22; 26.5.-2.6.; C.Marka;; 23; 2.6.-9.6.; H.Ungerechts (from Granada);; 24; 9.6.-16.6.; J.Santiago/F.Damour (Operators);; 25; 16.6.-23.6.; I.Hermelo;; 26; 23.6.-30.6.; C.Kramer (23.-26.6.), C.Marka (26.-30.6.); 22.-26.6. Heavy Maintenance: Secondary, Holography; 27; 30.6.-7.7.; N.Billot ; ; 28; 7.7.-14.7.; A.Sievers (from Granada); 11.7.: visit IRAM-OSN, 10.-13.7. 026-15 by C.Marka/F.Mirabel ; 29; 14.7.-21.7.; I.Hermelo (14.-18.7), S.Trevino (18.-20.7.), G.Paubert (20.-25.7.); 18.7.: visit IRAM-OSN ; 30; 21.7.-28.7.; G.Paubert (20.-25.7.), J.Santiago/F.Damour (Operators, 25.-28.7.); VESPA Polarimetry; 31; 28.7.-4.8.; C.Marka; Heterodyne Pool; 32; 4.8.-11.8.; J.L.Santaren (night time Operator); 8.8.: visit IRAM-OSN; 33; 11.8.-18.8.; I.Hermelo; 12/13.8. Installation of M4N/M5N, 15.8.: visit IRAM-OSN; 34; 18.8.-25.8.; A.Sievers;; 35; 25.8.-1.9.; C.Marka;; 36; 1.-8.9.; H.Ungerechts (from Granada);; 37; 8.-15.9.; N.Billot; 11.-18.9. Summerschool; 38; 15.-22.9.; G.Paubert; 11.-18.9. Summerschool, 17.9. IRAM Proposal Deadline; 39; 22.-29.9.; M.Ruiz; 3mm VLBI; 40; 29.9.-6.10.; Operators; NIKA2 Installation; 41; 6.-13.10; I. Hermelo (6.-9.10.) & C.Marka (9.-13.10.); Heterodyne Pool (NIKA2 cooling down); 42; 13.-20.10.; ; Part-time: NIKA2 testing; 43; 20.-27.10.; A.Sievers;Part-time: NIKA2 testing; 44; 27.10.-3.11.;;Part-time: NIKA2 testing; 45; 3.-10.11.;; EMIR Upgrades of E0(?) & E1; 46; 10.-17.11.;;; 47; 17.-24.11.;;; 48; 24.11.-1.12.;;; 49; 1.-8.12.;; Start of Wintersemester 2015/16; |
Line 17: | Line 57: |
Old AoD Plans: * AodSchedule14 * AodSchedule13 * AodSchedule112, AodSchedule212, AodSchedule3412 * AodSchedule411, AodSchedule311, AodSchedule211, AodSchedule111 * AodSchedule410, AodSchedule310, AodSchedule210, AodSchedule110 * AodSchedule409, AodSchedule309, AodSchedule209, AodSchedule109 * AodSchedule408, AodSchedule308 |
Old AoD Plans: