Differences between revisions 1 and 722 (spanning 721 versions)
Revision 1 as of 2005-10-21 09:42:22
Size: 748
Editor: gra-lx8
Comment:
Revision 722 as of 2013-03-04 12:24:46
Size: 1577
Editor: reduc01
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
{{{#!CSV
Week ; Dates ; AoD ; Comments
40 ; 4.10.-11.10.2005 ; Martin (Tue-Fri),Sievers (Fri-Tue) ; Summerschool till Friday, Martin can be contacted at summerschool.
41 ; 11.10.-18.10. ; Ruiz ; Ruiz can be contacted during his shift, VLBI Thu-Tue.
42 ; 18.10.-25.10. ; Marcelino (Tue-Fri),Leon (Fri-Tue) ; Fri-Tue: Pool.
43 ; 25.10.-1.11. ; Leon ; Pool.
44 ; 1.11.-8.11. ; Martin ; Pool (during the night). Coordinator: Leon (Granada). During day: NCS work
45 ; 8.11.-15.11. ; Leon;Pool (during the night), during day: NCS work
46 ; 15.11.-22.11. ; Ungerechts (Tue-Fri) ;
47 ; 22.11.-29.11. ; ;
48 ; 29.11.-6.12. ; ;
49 ; 6.12.-13.12. ; ;
50 ; 13.12.-20.12. ; ;
51 ; 20.12.-27.12. ; ;
52 ; 27.12.05-3.1.2006 ; ;
##language:en
#pragma section-numbers off

{{{
#!CSV
;;;;
1; 1.-8.1.2013; G.Bruni;;
2; 8.-15.1.2013; A.Sievers;;
3; 15.-22.1.2013; M.Gonzalez; Pool;
4; 22.-29.1.2013; N.Billot; Pool;
5; 29.1.-5.2.; S.Trevino;;
6; 5.-12.2.; J.L.Santaren/F.Damour (operators), I.Hermelo 8.-12.2.;;
7; 12.-19.2.; N.Billot; Pool, VLBI test on 14. or 18.2.;
8; 19.-26.2.; M.Gonzalez, I.Hermelo (19., 22.-26.2.); Pool;
9; 26.2.-5.3.; J.L.Santaren (night-time operator);;
10; 5.-12.3.; S.Trevino, I.Hermelo;;
11; 12.-19.3.; M.Gonzalez; 11.-13. HEMT installation & alignment, 15.-18. J.LeBourlot with students;
12; 19.-26.3.; G.Paubert (19.-22.3.), I.Hermelo (22.-29.3.); Pool & 1mm VLBI;
13; 26.3.-2.4.; F.Damour (day-time operator), I.Hermelo (22.-29.3.); Pool & 1mm VLBI (till 28.3.), Semana Santa;
14; 2.-9.4.; S.Trevino;;
15; 9.-16.4.; A.Sievers, C.Kramer 12.-19.4.; GISMO-Pool (10./11. PC meeting);
16; 16.-23.4.; I.Hermelo, C.Kramer -19.4.; GISMO-Pool;
17; 23.-30.4.; M.Gonzalez; GISMO-Pool;
18; 30.4.-7.5.; S.Trevino;;
19; 7.-14.5.; I.Hermelo;;
20; 14.-21.5.; M.Ruiz; 3mm VLBI (16.-22.5.);
21; 21.-28.5.; G.Paubert;;
22; 28.-4.6.; I.Hermelo; Start of Summer Semester;
23; 4.-11.6.; S.Trevino;;
24; 11.-18.6.; N.Billot; NIKA run;
25; 18.-25.6.;;;
Line 17: Line 33:

Old AoD Plans:
 * AodSchedule112, AodSchedule212, AodSchedule3412
 * AodSchedule411, AodSchedule311, AodSchedule211, AodSchedule111
 * AodSchedule410, AodSchedule310, AodSchedule210, AodSchedule110
 * AodSchedule409, AodSchedule309, AodSchedule209, AodSchedule109
 * AodSchedule408, AodSchedule308

1 1.-8.1.2013 G.Bruni
2 8.-15.1.2013 A.Sievers
3 15.-22.1.2013 M.Gonzalez Pool
4 22.-29.1.2013 N.Billot Pool
5 29.1.-5.2. S.Trevino
6 5.-12.2. J.L.Santaren/F.Damour (operators), I.Hermelo 8.-12.2.
7 12.-19.2. N.Billot Pool, VLBI test on 14. or 18.2.
8 19.-26.2. M.Gonzalez, I.Hermelo (19., 22.-26.2.) Pool
9 26.2.-5.3. J.L.Santaren (night-time operator)
10 5.-12.3. S.Trevino, I.Hermelo
11 12.-19.3. M.Gonzalez 11.-13. HEMT installation & alignment, 15.-18. J.LeBourlot with students
12 19.-26.3. G.Paubert (19.-22.3.), I.Hermelo (22.-29.3.) Pool & 1mm VLBI
13 26.3.-2.4. F.Damour (day-time operator), I.Hermelo (22.-29.3.) Pool & 1mm VLBI (till 28.3.), Semana Santa
14 2.-9.4. S.Trevino
15 9.-16.4. A.Sievers, C.Kramer 12.-19.4. GISMO-Pool (10./11. PC meeting)
16 16.-23.4. I.Hermelo, C.Kramer -19.4. GISMO-Pool
17 23.-30.4. M.Gonzalez GISMO-Pool
18 30.4.-7.5. S.Trevino
19 7.-14.5. I.Hermelo
20 14.-21.5. M.Ruiz 3mm VLBI (16.-22.5.)
21 21.-28.5. G.Paubert
22 28.-4.6. I.Hermelo Start of Summer Semester
23 4.-11.6. S.Trevino
24 11.-18.6. N.Billot NIKA run
25 18.-25.6.