Differences between revisions 1 and 683 (spanning 682 versions)
Revision 1 as of 2005-10-21 09:42:22
Size: 748
Editor: gra-lx8
Comment:
Revision 683 as of 2012-11-30 17:18:14
Size: 1741
Editor: lt-ck
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
{{{#!CSV
Week ; Dates ; AoD ; Comments
40 ; 4.10.-11.10.2005 ; Martin (Tue-Fri),Sievers (Fri-Tue) ; Summerschool till Friday, Martin can be contacted at summerschool.
41 ; 11.10.-18.10. ; Ruiz ; Ruiz can be contacted during his shift, VLBI Thu-Tue.
42 ; 18.10.-25.10. ; Marcelino (Tue-Fri),Leon (Fri-Tue) ; Fri-Tue: Pool.
43 ; 25.10.-1.11. ; Leon ; Pool.
44 ; 1.11.-8.11. ; Martin ; Pool (during the night). Coordinator: Leon (Granada). During day: NCS work
45 ; 8.11.-15.11. ; Leon;Pool (during the night), during day: NCS work
46 ; 15.11.-22.11. ; Ungerechts (Tue-Fri) ;
47 ; 22.11.-29.11. ; ;
48 ; 29.11.-6.12. ; ;
49 ; 6.12.-13.12. ; ;
50 ; 13.12.-20.12. ; ;
51 ; 20.12.-27.12. ; ;
52 ; 27.12.05-3.1.2006 ; ;
##language:en
#pragma section-numbers off

{{{
#!CSV
;;;;
27;3.-10.7.; H.Ungerechts;;
28;10.-17.7.; M.Gonzalez; YIG Band 4 tests;
29;17.-24.7.; J.Abreu ; AMSTAR+/HEMT on-sky tests;
30;24.-31.7.; G.Bruni (C.Buchbender 27.-31.7.);;
31;31.7.-7.8.; S.Trevino ;;
32;7.-14.8.; N.Billot;;
33;14.-21.8.; J.Abreu ;;
34;21.-28.8.; G.Bruni;;
35;28.8.-4.9.; M.Ruiz/F.Damour (operators);;
36;4.-11.9.; H.Ungerechts ;;
37;11.-18.9.; G.Paubert ;;
38;18.-25.9.; I.Ruiz/E.Lobato (operators) ; Heavy Maintenance: Holo-Rx, Gearboxes;
39;25.9.-2.10.; S.Trevino;;
40;2.-9.10.; J.Abreu;;
41;9.-16.10.; S.Trevino(9-11.10)/G.Bruni(11-18.10)/J.Abreu(11-16.10); Heterodyne Pool Week;
42;16.-23.10.; M.Gonzalez/G.Bruni(11-18.10); Heterodyne Pool Week;
43;23.-30.10.; J.Abreu;;
44; 30.10.-6.11.; C.Kramer, M.Gonzalez (30.-2.11.); GISMO Pool Week I;
45; 6.-13.11.; N.Billot (5.-8.11.), G.Bruni (6.-13.11.); GISMO Pool Week II;
46; 13.-20.11.; A.Sievers; NIKA Installation;
47; 20.-27.11.; N.Billot; NIKA Week;
48; 27.11.-4.12.; J.Abreu;;
49; 4.-11.12.; G.Paubert;;
50; 11.-18.12.; N.Billot;;
51; 18.-25.12.; J.Santiago/F.Damour (operators); Students with B.Lefloch 17.-21.12.;
51; 25.12.-1.1.2013; S.Trevino;;
1; 1.-8.1.2013; G.Bruni;;
2; 8.-15.1.2013; ;;
3; 15.-22.1.2013; M.Gonzalez; Pool;
4; 22.-29.1.2013; ; Pool;
5; 29.1.-5.2.; S.Trevino;;
6; 5.-12.2.; N.Billot;;
7; 12.-19.2.; G.Bruni; Pool;
8; 19.-26.2.; M.Gonzalez; Pool;
Line 17: Line 42:

Old AoD Plans:
 * AodSchedule112, AodSchedule212
 * AodSchedule411, AodSchedule311, AodSchedule211, AodSchedule111
 * AodSchedule410, AodSchedule310, AodSchedule210, AodSchedule110
 * AodSchedule409, AodSchedule309, AodSchedule209, AodSchedule109
 * AodSchedule408, AodSchedule308

27 3.-10.7. H.Ungerechts
28 10.-17.7. M.Gonzalez YIG Band 4 tests
29 17.-24.7. J.Abreu AMSTAR+/HEMT on-sky tests
30 24.-31.7. G.Bruni (C.Buchbender 27.-31.7.)
31 31.7.-7.8. S.Trevino
32 7.-14.8. N.Billot
33 14.-21.8. J.Abreu
34 21.-28.8. G.Bruni
35 28.8.-4.9. M.Ruiz/F.Damour (operators)
36 4.-11.9. H.Ungerechts
37 11.-18.9. G.Paubert
38 18.-25.9. I.Ruiz/E.Lobato (operators) Heavy Maintenance: Holo-Rx, Gearboxes
39 25.9.-2.10. S.Trevino
40 2.-9.10. J.Abreu
41 9.-16.10. S.Trevino(9-11.10)/G.Bruni(11-18.10)/J.Abreu(11-16.10) Heterodyne Pool Week
42 16.-23.10. M.Gonzalez/G.Bruni(11-18.10) Heterodyne Pool Week
43 23.-30.10. J.Abreu
44 30.10.-6.11. C.Kramer, M.Gonzalez (30.-2.11.) GISMO Pool Week I
45 6.-13.11. N.Billot (5.-8.11.), G.Bruni (6.-13.11.) GISMO Pool Week II
46 13.-20.11. A.Sievers NIKA Installation
47 20.-27.11. N.Billot NIKA Week
48 27.11.-4.12. J.Abreu
49 4.-11.12. G.Paubert
50 11.-18.12. N.Billot
51 18.-25.12. J.Santiago/F.Damour (operators) Students with B.Lefloch 17.-21.12.
51 25.12.-1.1.2013 S.Trevino
1 1.-8.1.2013 G.Bruni
2 8.-15.1.2013
3 15.-22.1.2013 M.Gonzalez Pool
4 22.-29.1.2013 Pool
5 29.1.-5.2. S.Trevino
6 5.-12.2. N.Billot
7 12.-19.2. G.Bruni Pool
8 19.-26.2. M.Gonzalez Pool

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)