Differences between revisions 1 and 514 (spanning 513 versions)
Revision 1 as of 2005-10-21 09:42:22
Size: 748
Editor: gra-lx8
Comment:
Revision 514 as of 2011-05-06 14:42:43
Size: 1185
Editor: lt-ck
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
{{{#!CSV
Week ; Dates ; AoD ; Comments
40 ; 4.10.-11.10.2005 ; Martin (Tue-Fri),Sievers (Fri-Tue) ; Summerschool till Friday, Martin can be contacted at summerschool.
41 ; 11.10.-18.10. ; Ruiz ; Ruiz can be contacted during his shift, VLBI Thu-Tue.
42 ; 18.10.-25.10. ; Marcelino (Tue-Fri),Leon (Fri-Tue) ; Fri-Tue: Pool.
43 ; 25.10.-1.11. ; Leon ; Pool.
44 ; 1.11.-8.11. ; Martin ; Pool (during the night). Coordinator: Leon (Granada). During day: NCS work
45 ; 8.11.-15.11. ; Leon;Pool (during the night), during day: NCS work
46 ; 15.11.-22.11. ; Ungerechts (Tue-Fri) ;
47 ; 22.11.-29.11. ; ;
48 ; 29.11.-6.12. ; ;
49 ; 6.12.-13.12. ; ;
50 ; 13.12.-20.12. ; ;
51 ; 20.12.-27.12. ; ;
52 ; 27.12.05-3.1.2006 ; ;
##language:en
#pragma section-numbers off

{{{
#!CSV
;;;;
Week ; Dates ; AoD ; Comments;;
14;5.4.-12.4.;J.Abreu;;
15;12.4.-19.4.;G.Quintana-Lacaci; GISMO 4th test run;
16;19.-26.4.;C.Buchbender;Semana Santa;
17;26.4.-3.5.;M.Gonzalez; ;
18;3.-10.5.;D.Riquelme (3.-5.5.), M.Ruiz; VLBI@3mm;
19;10.-17.5.;J.Abreu; ;
20;17.-24.5.;C.Buchbender; ;
21;24.-31.5.;G.Paubert;;
22;31.5.-7.6.;J.Abreu; (Toledo conference 30.5.-3.6.);
23;7.-14.6.;D.Riquelme;;
24;14.-21.6.;C.Buchbender;;
25;21.-28.6.;G.Quintana-Lacaci (remotely from Granada), F.Damour (night-time op.);;
26;28.6.-5.7.; G.Paubert; 27.-30.6. TT-NCS Installation of 32GHz-FTS-System, 1st tests;
27;5.-12.7.; J.Abreu/S.Morales;;
28;12.-19.7.; M.Gonzalez/N.Billot; 12.-14.7. 32GHz-FTS-System commissioning;
29;19.-26.7.; C.Buchbender/S.Morales;;
30;26.7.-2.8.; A.Sievers/N.Billot; 25.-28.7. TT-NCS 32GHz-FTS-System;
31;2.-9.8.;;;
32;9.-16.8.;;
33;16.-23.8.; J.Abreu;
34;23.-30.8.; C.Buchbender;
Line 17: Line 30:

Old AoD Plans:
 * AodSchedule111
 * AodSchedule410, AodSchedule310, AodSchedule210, AodSchedule110
 * AodSchedule409, AodSchedule309, AodSchedule209, AodSchedule109
 * AodSchedule408, AodSchedule308

Week Dates AoD Comments
14 5.4.-12.4. J.Abreu
15 12.4.-19.4. G.Quintana-Lacaci GISMO 4th test run
16 19.-26.4. C.Buchbender Semana Santa
17 26.4.-3.5. M.Gonzalez
18 3.-10.5. D.Riquelme (3.-5.5.), M.Ruiz VLBI@3mm
19 10.-17.5. J.Abreu
20 17.-24.5. C.Buchbender
21 24.-31.5. G.Paubert
22 31.5.-7.6. J.Abreu (Toledo conference 30.5.-3.6.)
23 7.-14.6. D.Riquelme
24 14.-21.6. C.Buchbender
25 21.-28.6. G.Quintana-Lacaci (remotely from Granada), F.Damour (night-time op.)
26 28.6.-5.7. G.Paubert 27.-30.6. TT-NCS Installation of 32GHz-FTS-System, 1st tests
27 5.-12.7. J.Abreu/S.Morales
28 12.-19.7. M.Gonzalez/N.Billot 12.-14.7. 32GHz-FTS-System commissioning
29 19.-26.7. C.Buchbender/S.Morales
30 26.7.-2.8. A.Sievers/N.Billot 25.-28.7. TT-NCS 32GHz-FTS-System
31 2.-9.8.
32 9.-16.8.
33 16.-23.8. J.Abreu
34 23.-30.8. C.Buchbender

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)