Differences between revisions 1 and 486 (spanning 485 versions)
Revision 1 as of 2005-10-21 09:42:22
Size: 748
Editor: gra-lx8
Comment:
Revision 486 as of 2011-02-13 10:30:27
Size: 1244
Editor: 177
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
{{{#!CSV
Week ; Dates ; AoD ; Comments
40 ; 4.10.-11.10.2005 ; Martin (Tue-Fri),Sievers (Fri-Tue) ; Summerschool till Friday, Martin can be contacted at summerschool.
41 ; 11.10.-18.10. ; Ruiz ; Ruiz can be contacted during his shift, VLBI Thu-Tue.
42 ; 18.10.-25.10. ; Marcelino (Tue-Fri),Leon (Fri-Tue) ; Fri-Tue: Pool.
43 ; 25.10.-1.11. ; Leon ; Pool.
44 ; 1.11.-8.11. ; Martin ; Pool (during the night). Coordinator: Leon (Granada). During day: NCS work
45 ; 8.11.-15.11. ; Leon;Pool (during the night), during day: NCS work
46 ; 15.11.-22.11. ; Ungerechts (Tue-Fri) ;
47 ; 22.11.-29.11. ; ;
48 ; 29.11.-6.12. ; ;
49 ; 6.12.-13.12. ; ;
50 ; 13.12.-20.12. ; ;
51 ; 20.12.-27.12. ; ;
52 ; 27.12.05-3.1.2006 ; ;
##language:en
#pragma section-numbers off

{{{
#!CSV
;;;;
Week ; Dates ; AoD ; Comments;;
51;28.12.2010-4.1.2011;J.Abreu (J.Santiago, night-time-operator);restart of HERA pool on Friday 7.1.;
1;4.1.2011-11.1.;C.Buchbender (M.Ruiz, night-time-operator); HERA pool week;
2;11.1.-18.1.;M.Gonzalez; HERA pool week;
3;18.1.-25.1.;G.Quintana-Lacaci (18.1-21.1)/J.Abreu (21.1-25.1) ; MAMBO pool week;
4;25.1.-1.2.;H.Ungerechts;
5;1.2.-8.2.;G.Paubert;
6;8.2.-15.2.;G.Quintana; MAMBO pool week;
7;15.2.-22.2.;M.Gonzalez(15.2.-17.2.)/A.Sievers(18.2.-22.2.); HERA pool week;
8;22.2.-1.3.;G.Quintana-Lacaci/J.Abreu (25.3-1.3); MAMBO pool week;
9;1.3.-8.3.;M.Gonzalez; HERA pool week;
10;8.3.-15.3.;D.Riquelme;;
11;15.3.-22.3.;J.Abreu; Reserve pool week;
12;22.3.-29.3.;C.Buchbender; VLBI@1mm fringe test, 228-09;
13;29.3.-5.4.;D.Riquelme; VLBI@1mm;
14;5.4.-12.4.;J.Abreu;;
15;12.4.-19.4.;G.Quintana-Lacaci; GISMO + 32GHzIF installation;
16;19.-26.4.;C.Buchbender;Semana Santa;
17;26.4.-3.5.;M.Gonzalez;32GHzIF on-the-sky commissioning;
Line 17: Line 27:

Old AoD Plans:
 * AodSchedule410, AodSchedule310, AodSchedule210, AodSchedule110
 * AodSchedule409, AodSchedule309, AodSchedule209, AodSchedule109
 * AodSchedule408, AodSchedule308

Week Dates AoD Comments
51 28.12.2010-4.1.2011 J.Abreu (J.Santiago, night-time-operator) restart of HERA pool on Friday 7.1.
1 4.1.2011-11.1. C.Buchbender (M.Ruiz, night-time-operator) HERA pool week
2 11.1.-18.1. M.Gonzalez HERA pool week
3 18.1.-25.1. G.Quintana-Lacaci (18.1-21.1)/J.Abreu (21.1-25.1) MAMBO pool week
4 25.1.-1.2. H.Ungerechts
5 1.2.-8.2. G.Paubert
6 8.2.-15.2. G.Quintana MAMBO pool week
7 15.2.-22.2. M.Gonzalez(15.2.-17.2.)/A.Sievers(18.2.-22.2.) HERA pool week
8 22.2.-1.3. G.Quintana-Lacaci/J.Abreu (25.3-1.3) MAMBO pool week
9 1.3.-8.3. M.Gonzalez HERA pool week
10 8.3.-15.3. D.Riquelme
11 15.3.-22.3. J.Abreu Reserve pool week
12 22.3.-29.3. C.Buchbender VLBI@1mm fringe test, 228-09
13 29.3.-5.4. D.Riquelme VLBI@1mm
14 5.4.-12.4. J.Abreu
15 12.4.-19.4. G.Quintana-Lacaci GISMO + 32GHzIF installation
16 19.-26.4. C.Buchbender Semana Santa
17 26.4.-3.5. M.Gonzalez 32GHzIF on-the-sky commissioning

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)