Differences between revisions 1 and 480 (spanning 479 versions)
Revision 1 as of 2005-10-21 09:42:22
Size: 748
Editor: gra-lx8
Comment:
Revision 480 as of 2011-02-09 12:46:37
Size: 1929
Editor: visitor16
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
{{{#!CSV
Week ; Dates ; AoD ; Comments
40 ; 4.10.-11.10.2005 ; Martin (Tue-Fri),Sievers (Fri-Tue) ; Summerschool till Friday, Martin can be contacted at summerschool.
41 ; 11.10.-18.10. ; Ruiz ; Ruiz can be contacted during his shift, VLBI Thu-Tue.
42 ; 18.10.-25.10. ; Marcelino (Tue-Fri),Leon (Fri-Tue) ; Fri-Tue: Pool.
43 ; 25.10.-1.11. ; Leon ; Pool.
44 ; 1.11.-8.11. ; Martin ; Pool (during the night). Coordinator: Leon (Granada). During day: NCS work
45 ; 8.11.-15.11. ; Leon;Pool (during the night), during day: NCS work
46 ; 15.11.-22.11. ; Ungerechts (Tue-Fri) ;
47 ; 22.11.-29.11. ; ;
48 ; 29.11.-6.12. ; ;
49 ; 6.12.-13.12. ; ;
50 ; 13.12.-20.12. ; ;
51 ; 20.12.-27.12. ; ;
52 ; 27.12.05-3.1.2006 ; ;
##language:en
#pragma section-numbers off

{{{
#!CSV
;;;;
Week ; Dates ; AoD ; Comments;;
40;5.10.-12.10.2010;M.Ruiz;Global 3mm VLBI (7.-12.10.);
41;12.10.-19.10.;J.Abreu & H.Ungerechts (14.-19.10.); NIKA arrives on 14.10. ;
42;19.10.-26.10.;D.Riquelme; NIKA run + Obs.;
43;26.10.-2.11.;G.Quintana-Lacaci (25.-29.10.), C.Buchbender (29.10.-2.11.), J.Abreu (29.10.-5.11.);MAMBO2 re-installation & checkout (starts on 25.10.), Poolweek;
44;2.11.-9.11.;M.Gonzalez (2.-7.11.) & J.Abreu (29.10.-5.11.), M.Ruiz (8.-9.11., day-time operator);HERA Poolweek, HERM33ES workshop 8./9.11.;
45;9.11.-16.11.;A.Sievers;MAMBO2 Poolweek;
46;16.11.-23.11.;M.Gonzalez;HERA Poolweek;
47;23.11.-30.11.;J.Abreu;Reserve Poolweek, End of Summersemester 2010;
48;30.11.-7.12.;C.Buchbender;+++Start of winter semester 2010/11+++;
49;7.12.-14.12.;D.Riquelme/M.Gonzalez (replacing G.Quintana-Lacaci); 1st MAMBO2;
50;14.12.-21.12.;M.Gonzalez (F.Damour, day-time-operator);1st HERA Poolweek;
51;21.12.-28.12.;D.Riquelme (F.Damour, day-time-operator);;
51;28.12.-4.1.;J.Abreu (J.Santiago, night-time-operator);restart of HERA pool on Friday 7.1.;
1;4.1.2011-11.1.;C.Buchbender (M.Ruiz, night-time-operator); HERA pool week;
2;11.1.-18.1.;M.Gonzalez; HERA pool week;
3;18.1.-25.1.;G.Quintana-Lacaci (18.1-21.1)/J.Abreu (21.1-25.1) ; MAMBO pool week;
4;25.1.-1.2.;H.Ungerechts;
5;1.2.-8.2.;G.Paubert;
6;8.2.-15.2.;J.Abreu/G.Quintana(11.2-15.2); MAMBO pool week;
7;15.2.-17.2.;M.Gonzalez/A.Sievers(18.2.-22.2.); HERA pool week;
8;22.2.-1.3.;G.Quintana-Lacaci/J.Abreu (25.3-1.3); MAMBO pool week;
9;1.3.-8.3.;M.Gonzalez; HERA pool week;
10;8.3.-15.3.;D.Riquelme;;
11;15.3.-22.3.;J.Abreu; Reserve pool week;
12;22.3.-29.3.;C.Buchbender;228-09 scheduled;
Line 17: Line 34:

Old AoD Plans:
 * AodSchedule310, AodSchedule210, AodSchedule110
 * AodSchedule409, AodSchedule309, AodSchedule209, AodSchedule109
 * AodSchedule408, AodSchedule308

Week Dates AoD Comments
40 5.10.-12.10.2010 M.Ruiz Global 3mm VLBI (7.-12.10.)
41 12.10.-19.10. J.Abreu & H.Ungerechts (14.-19.10.) NIKA arrives on 14.10.
42 19.10.-26.10. D.Riquelme NIKA run + Obs.
43 26.10.-2.11. G.Quintana-Lacaci (25.-29.10.), C.Buchbender (29.10.-2.11.), J.Abreu (29.10.-5.11.) MAMBO2 re-installation & checkout (starts on 25.10.), Poolweek
44 2.11.-9.11. M.Gonzalez (2.-7.11.) & J.Abreu (29.10.-5.11.), M.Ruiz (8.-9.11., day-time operator) HERA Poolweek, HERM33ES workshop 8./9.11.
45 9.11.-16.11. A.Sievers MAMBO2 Poolweek
46 16.11.-23.11. M.Gonzalez HERA Poolweek
47 23.11.-30.11. J.Abreu Reserve Poolweek, End of Summersemester 2010
48 30.11.-7.12. C.Buchbender +++Start of winter semester 2010/11+++
49 7.12.-14.12. D.Riquelme/M.Gonzalez (replacing G.Quintana-Lacaci) 1st MAMBO2
50 14.12.-21.12. M.Gonzalez (F.Damour, day-time-operator) 1st HERA Poolweek
51 21.12.-28.12. D.Riquelme (F.Damour, day-time-operator)
51 28.12.-4.1. J.Abreu (J.Santiago, night-time-operator) restart of HERA pool on Friday 7.1.
1 4.1.2011-11.1. C.Buchbender (M.Ruiz, night-time-operator) HERA pool week
2 11.1.-18.1. M.Gonzalez HERA pool week
3 18.1.-25.1. G.Quintana-Lacaci (18.1-21.1)/J.Abreu (21.1-25.1) MAMBO pool week
4 25.1.-1.2. H.Ungerechts
5 1.2.-8.2. G.Paubert
6 8.2.-15.2. J.Abreu/G.Quintana(11.2-15.2) MAMBO pool week
7 15.2.-17.2. M.Gonzalez/A.Sievers(18.2.-22.2.) HERA pool week
8 22.2.-1.3. G.Quintana-Lacaci/J.Abreu (25.3-1.3) MAMBO pool week
9 1.3.-8.3. M.Gonzalez HERA pool week
10 8.3.-15.3. D.Riquelme
11 15.3.-22.3. J.Abreu Reserve pool week
12 22.3.-29.3. C.Buchbender 228-09 scheduled

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)