Size: 748
Comment:
|
Size: 1724
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
{{{#!CSV Week ; Dates ; AoD ; Comments 40 ; 4.10.-11.10.2005 ; Martin (Tue-Fri),Sievers (Fri-Tue) ; Summerschool till Friday, Martin can be contacted at summerschool. 41 ; 11.10.-18.10. ; Ruiz ; Ruiz can be contacted during his shift, VLBI Thu-Tue. 42 ; 18.10.-25.10. ; Marcelino (Tue-Fri),Leon (Fri-Tue) ; Fri-Tue: Pool. 43 ; 25.10.-1.11. ; Leon ; Pool. 44 ; 1.11.-8.11. ; Martin ; Pool (during the night). Coordinator: Leon (Granada). During day: NCS work 45 ; 8.11.-15.11. ; Leon;Pool (during the night), during day: NCS work 46 ; 15.11.-22.11. ; Ungerechts (Tue-Fri) ; 47 ; 22.11.-29.11. ; ; 48 ; 29.11.-6.12. ; ; 49 ; 6.12.-13.12. ; ; 50 ; 13.12.-20.12. ; ; 51 ; 20.12.-27.12. ; ; 52 ; 27.12.05-3.1.2006 ; ; |
##language:en #pragma section-numbers off {{{ #!CSV ;;;; Week ; Dates ; AoD ; Comments;; 27;6.7.-13.7.;J.Santiago (day-time operator);; 28;13.7.-20.7.;R.Aladro;; 29;20.7.-27.7.;F.Damour & M.Ruiz (operators);; 30;27.7.-3.8.;A.Sievers (27.+28.7.), M.Gonzalez (29.7.-3.8. during day-time from Granada), J.Santiago (night-time operator);; 31;3.8.-10.8.;C.Buchbender (-12.8.); 228-09; 32;10.8.-17.8.;D.Riquelme (12.8.-17.8.) & J.Abreu (10.-16.);; 33;17.8.-24.8.;M.Gonzalez & C.Kramer;HEMT Receiver: Installation & Tests; 34;24.8.-31.8.;D.Riquelme (24.8-27-8);; 35;31.8.-7.9.;R.Aladro (27.8.-3.9.), C.Buchbender (3.9.-10.9.) & J.Abreu (3.9.-7.9.); 228-09 (7.-13.9.); 36;7.9.-14.9.;C.Buchbender (3.9.-10.9.), A.Sievers (10.9.-14.9.);; 37;14.9.-21.9.;D.Riquelme & J.Abreu (-20.9.);; 38;21.9.-28.9.;G.Quintana-Lacaci (24.-27.9.);Heavy Maintenance: Exchange of El-Gearbox+Observations; 39;28.9.-5.10.;G.Paubert (1.-5.10.);Heavy Maintenance: Exchange of Az-Gearbox+Obs.; 40;5.10.-12.10.;M.Ruiz;Global 3mm VLBI (7.-12.10.); 41;12.10.-19.10.;J.Abreu & H.Ungerechts; HU from 14.9. NIKA arrives on 14.9. ; 42;19.10.-26.10.;D.Riquelme (& A.Sievers);NIKA run + Obs.; 43;26.10.-2.11.;G.Quintana-Lacaci (25.-29.10.), R.Aladro (29.10.-2.11.);MAMBO2 re-installation & checkout (starts on 25.10.), Poolweek; 44;2.11.-9.11.;M.Gonzalez & J.Abreu;HERA Poolweek; 45;9.11.-16.11.;G.Quintana-Lacaci;MAMBO2 Poolweek; 46;16.11.-23.11.;M.Gonzalez;HERA Poolweek; 47;23.11.-30.11.;;Reserve Poolweek, End of Summersemester 2010; 48;30.11.-7.12.;;Start of WS2010/11; |
Line 17: | Line 31: |
Old AoD Plans: * AodSchedule210, AodSchedule110 * AodSchedule409, AodSchedule309, AodSchedule209, AodSchedule109 * AodSchedule408, AodSchedule308 |