Differences between revisions 1 and 313 (spanning 312 versions)
Revision 1 as of 2005-10-21 09:42:22
Size: 748
Editor: gra-lx8
Comment:
Revision 313 as of 2009-12-23 10:19:34
Size: 1401
Editor: lt-ck
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
{{{#!CSV ##language:en
#pragma section-numbers off

{{{
#!CSV
Line 3: Line 7:
40 ; 4.10.-11.10.2005 ; Martin (Tue-Fri),Sievers (Fri-Tue) ; Summerschool till Friday, Martin can be contacted at summerschool.
41 ; 11.10.-18.10. ; Ruiz ; Ruiz can be contacted during his shift, VLBI Thu-Tue.
42 ; 18.10.-25.10. ; Marcelino (Tue-Fri),Leon (Fri-Tue) ; Fri-Tue: Pool.
43 ; 25.10.-1.11. ; Leon ; Pool.
44 ; 1.11.-8.11. ; Martin ; Pool (during the night). Coordinator: Leon (Granada). During day: NCS work
45 ; 8.11.-15.11. ; Leon;Pool (during the night), during day: NCS work
46 ; 15.11.-22.11. ; Ungerechts (Tue-Fri) ;
47 ; 22.11.-29.11. ; ;
48 ; 29.11.-6.12. ; ;
49 ; 6.12.-13.12. ; ;
50 ; 13.12.-20.12. ; ;
51 ; 20.12.-27.12. ; ;
52 ; 27.12.05-3.1.2006 ; ;
40;29.9.-6.10.;R.Aladro;HERA pool
41;6.10.-13.10;H.Ungerechts (6.10.-8.10.) & M.Ruiz (entire week);VLBI(8.-13.10.)
42;13.10.-20.10;H.Wiesemeyer&M.Gonzalez(13.-16.), C.Thum(16.-20.); (HERA pool, Installation of NIKA on 16.10. with limited access to Rx cabin (about 1hour daily))
43;20.10.-27.10;C.Buchbender(20.-23.), A.Sievers(23.-27.10.); (NIKA 21.-27.10. T16-09 daytime, PC Meeting 27./28.10.)
44;27.10.-3.11.;R.Aladro & M.Gonzalez; Removal of NIKA on 27.10. during Wed maintenance, HERA pool
45;3.11.-10.11.;G.Quintana-Lacaci; T05-09 + MAMBO pool
46;10.11.-17.11.;M.Gonzalez & C.Buchbender;HERA pool
47;17.11.-24.11.;B.Ocana;
48;24.11.-1.12.;D.Riquelme;HERA pool backup
49;1.12.-8.12.;C.Buchbender;
50;8.12.-15.12.;A.Sievers;MAMBO pool
51;15.12.-22.12.;C.Buchbender(15.-18.), M.Gonzalez(18.-22.);HERA pool
52;22.12.29.12.;D.Riquelme;
53;29.12.-5.1.2010;R.Aladro;
1;5.1.-12.1.;B.Ocana(5-7), D.Riquelme(7-12);MAMBO pool 8.-19.1.;
2;12.1-19.1.; G.Quintana-Lacai;MAMBO pool;
3;19.1.-26.1.; M.Gonzalez;HERA pool;
4;26.1.-2.2.;;HERA pool;
5;2.3.-9.3.; M.Gonzalez;HERA pool;
6;9.3.-16.3.;;MAMBO pool;
7;16.3.-23.3.;;visit of Paris students;
9;23.3.-30.3.; M.Gonzalez;HERA pool;
;;;
Line 17: Line 31:

Old AoD Plans:
 * AodSchedule309, AodSchedule209, AodSchedule109
 * AodSchedule408, AodSchedule308

Week Dates AoD Comments
40 29.9.-6.10. R.Aladro HERA pool
41 6.10.-13.10 H.Ungerechts (6.10.-8.10.) & M.Ruiz (entire week) VLBI(8.-13.10.)
42 13.10.-20.10 H.Wiesemeyer&M.Gonzalez(13.-16.), C.Thum(16.-20.) (HERA pool, Installation of NIKA on 16.10. with limited access to Rx cabin (about 1hour daily))
43 20.10.-27.10 C.Buchbender(20.-23.), A.Sievers(23.-27.10.) (NIKA 21.-27.10. T16-09 daytime, PC Meeting 27./28.10.)
44 27.10.-3.11. R.Aladro & M.Gonzalez Removal of NIKA on 27.10. during Wed maintenance, HERA pool
45 3.11.-10.11. G.Quintana-Lacaci T05-09 + MAMBO pool
46 10.11.-17.11. M.Gonzalez & C.Buchbender HERA pool
47 17.11.-24.11. B.Ocana
48 24.11.-1.12. D.Riquelme HERA pool backup
49 1.12.-8.12. C.Buchbender
50 8.12.-15.12. A.Sievers MAMBO pool
51 15.12.-22.12. C.Buchbender(15.-18.), M.Gonzalez(18.-22.) HERA pool
52 22.12.29.12. D.Riquelme
53 29.12.-5.1.2010 R.Aladro
1 5.1.-12.1. B.Ocana(5-7), D.Riquelme(7-12) MAMBO pool 8.-19.1.
2 12.1-19.1. G.Quintana-Lacai MAMBO pool
3 19.1.-26.1. M.Gonzalez HERA pool
4 26.1.-2.2. HERA pool
5 2.3.-9.3. M.Gonzalez HERA pool
6 9.3.-16.3. MAMBO pool
7 16.3.-23.3. visit of Paris students
9 23.3.-30.3. M.Gonzalez HERA pool

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)