Size: 748
Comment:
|
Size: 1448
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
{{{#!CSV | ##language:en #pragma section-numbers off AodSchedule308, AodSchedule408, AodSchedule109, AodSchedule209 {{{ #!CSV |
Line 3: | Line 9: |
40 ; 4.10.-11.10.2005 ; Martin (Tue-Fri),Sievers (Fri-Tue) ; Summerschool till Friday, Martin can be contacted at summerschool. 41 ; 11.10.-18.10. ; Ruiz ; Ruiz can be contacted during his shift, VLBI Thu-Tue. 42 ; 18.10.-25.10. ; Marcelino (Tue-Fri),Leon (Fri-Tue) ; Fri-Tue: Pool. 43 ; 25.10.-1.11. ; Leon ; Pool. 44 ; 1.11.-8.11. ; Martin ; Pool (during the night). Coordinator: Leon (Granada). During day: NCS work 45 ; 8.11.-15.11. ; Leon;Pool (during the night), during day: NCS work 46 ; 15.11.-22.11. ; Ungerechts (Tue-Fri) ; 47 ; 22.11.-29.11. ; ; 48 ; 29.11.-6.12. ; ; 49 ; 6.12.-13.12. ; ; 50 ; 13.12.-20.12. ; ; 51 ; 20.12.-27.12. ; ; 52 ; 27.12.05-3.1.2006 ; ; |
28;7.-14.7.;F.Damour (night time op.)/D.Riquelme (7.-10.7)/C.Kramer (10.-13.7.); (11.7. visit, NCS: 6.-9.7.) 29;14.7.-21.7.;A.Sievers; 30;21.7.-28.7.;C.Kramer/C.Buchbender; (25.7. visitors - BO, 28.7. visit of German General Consul) 31;28.7.-4.8.;G.Quintana-Lacaci; 32;4.8.-11.8.;R.Aladro (4-7.8)/C.Buchbender (7-11.8); (8.8. visit) 33;11.8.-18.8.;C.Buchbender(11.-14.8.)/D.Riquelme(14.-8.8.); (NCS: 10.-13.8.) 34;18.8.-25.8.;R. Aladro; 35;25.8.-1.9.;G.Quintana-Lacaci; (MAMBO2 test period) 36;1.9.-8.9.;H.Wiesemeyer; (Summerschool 4.-11.9., 5.9. visit) 37;8.9.-15.9.;G.Paubert; (NCS: 14.-17.9.) 38;15.9.-22.9.;B.Ocana; (Heavy Maintenance: 21.-25.9.) 39;22.9.-29.9.;D.Riquelme; (IRAM 30 years anniversary 28.-30.9.) 40;29.9.-6.10.;R.Aladro;HERA pool 41;6.10.-13.10;H.Ungerechts (6.10.-8.10.) & M.Ruiz (entire week);VLBI(8.-13.10.) 42;13.10.-20.10;H.Wiesemeyer & M.Gonzalez; (HERA pool, Installation of NIKA on 16.10. with limited access to Rx cabin) 43;20.10.-27.10;A.Sievers; (NIKA 21.-27.10. T16-09 daytime) 44;27.10.-3.11.;; Removal of NIKA on 28.10. during Wed maintenance, HERA pool 45;3.11.-10.11.;G.Quintana-Lacaci; T05-09 + MAMBO pool 46;10.11.-17.11.;M.Gonzalez & C.Buchbender;HERA pool 47;17.11.-24.11.;; 48;24.11.-1.12.;D. Riquelme;HERA pool backup ;;; |