Size: 748
Comment:
|
Size: 1784
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
{{{#!CSV | ##language:en #pragma section-numbers off AodSchedule3-08 {{{ #!CSV |
Line 3: | Line 10: |
40 ; 4.10.-11.10.2005 ; Martin (Tue-Fri),Sievers (Fri-Tue) ; Summerschool till Friday, Martin can be contacted at summerschool. 41 ; 11.10.-18.10. ; Ruiz ; Ruiz can be contacted during his shift, VLBI Thu-Tue. 42 ; 18.10.-25.10. ; Marcelino (Tue-Fri),Leon (Fri-Tue) ; Fri-Tue: Pool. 43 ; 25.10.-1.11. ; Leon ; Pool. 44 ; 1.11.-8.11. ; Martin ; Pool (during the night). Coordinator: Leon (Granada). During day: NCS work 45 ; 8.11.-15.11. ; Leon;Pool (during the night), during day: NCS work 46 ; 15.11.-22.11. ; Ungerechts (Tue-Fri) ; 47 ; 22.11.-29.11. ; ; 48 ; 29.11.-6.12. ; ; 49 ; 6.12.-13.12. ; ; 50 ; 13.12.-20.12. ; ; 51 ; 20.12.-27.12. ; ; 52 ; 27.12.05-3.1.2006 ; ; |
40;30.9.-7.10.;H.Wiesemeyer;HERA pool 41;7.10.-15.10.;F.Damour (7.-9.10.), M.Ruiz (9.-15.10.);VLBI (F.Damour can be contacted during his night shift) 42;14.10.-21.10.;R.Aladro (Tue-Fri), D.Riquelme (Fri-Tue);HERA pool (GISMO installation) 43;21.10.-28.10.;H.Ungerechts (Tue-Thu), A.Sievers (Thu-Tue);GISMO observations, TT NCS 27.-30.10. 44;28.10.-4.11.;R.Aladro (28.-31.10.), D.Riquelme (31.10.-7.11.); HERA-Pool 45;4.11.-11.11.;D.Riquelme (31.10.-7.11.), R.Aladro (7.11.-11.11.); MAMBO-Tests 46;11.11.-18.11.;B.Ocana; MAMBO-Pool 47;18.11.-25.11.;D.Riquelme; MAMBO-Pool 48;25.11.-2.12.;F.Damour (nighttime), M.Ruiz (daytime); ABCD-Calibrators, NCS/EMIR Tests: 24.-27.11. 49;2.12.-9.12.;F.Damour; (F.Damour can be contacted during his nighttime shift) 50;9.12.-16.12.;J.Santiago; HERA-Pool (J.Santiago can be contacted during his nighttime shift) 51;16.12.-23.12.;B.Ocana; HERA-Pool, NCS/EMIR Tests: 15.12.-18.12. 52;23.12.-30.12.;R.Aladro; 1;30.12.-6.1.;H.Ungerechts; 2;6.1.-13.1.;G.Paubert; 3;13.1.-20.1.;H.Wiesemeyer; HERA-Pool, NCS/EMIR Tests: 12.-15.1. 4;20.1.-27.1.;D.Riquelme; HERA-Pool 5;27.1.-3.2.;C.Kramer; HERA-Pool Week No.5 6;3.2.-10.2.;R.Aladro; ABCD 7;10.2.-17.2.;J.Santiago (daytime op); ABCD 8;17.2.-24.2.;; HERA-Pool Week No.6 9;24.2.-3.3.;A.Sievers?; MAMBO-Pool Week No.1 + HERA+ABCD 10;3.3.-10.3.;B.Ocana; MAMBO-Pool #2 + ABCD-Demounting 11;10.3.-17.3.;R.Aladro; MAMBO-Pool #3 + EMIR Installation 12;17.3.-24.3.;; MAMBO-Pool #4 + EMIR cool down and first light 13;24.3.-31.3.;H.Wiesemeyer; MAMBO-Pool #5 + EMIR/NCS Tests 14;31.3.-7.4.;B.Ocana; MAMBO-Pool #6 + EMIR/NCS Tests 15;7.4.-14.4.;C.Kramer; EMIR Commissioning |
AodSchedule3-08