Differences between revisions 1 and 167 (spanning 166 versions)
Revision 1 as of 2005-10-21 09:42:22
Size: 748
Editor: gra-lx8
Comment:
Revision 167 as of 2008-11-18 12:09:44
Size: 1309
Editor: mrt-lx17
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
{{{#!CSV ##language:en
#pragma section-numbers off

AodSchedule3-08


{{{
#!CSV
Line 3: Line 10:
40 ; 4.10.-11.10.2005 ; Martin (Tue-Fri),Sievers (Fri-Tue) ; Summerschool till Friday, Martin can be contacted at summerschool.
41 ; 11.10.-18.10. ; Ruiz ; Ruiz can be contacted during his shift, VLBI Thu-Tue.
42 ; 18.10.-25.10. ; Marcelino (Tue-Fri),Leon (Fri-Tue) ; Fri-Tue: Pool.
43 ; 25.10.-1.11. ; Leon ; Pool.
44 ; 1.11.-8.11. ; Martin ; Pool (during the night). Coordinator: Leon (Granada). During day: NCS work
45 ; 8.11.-15.11. ; Leon;Pool (during the night), during day: NCS work
46 ; 15.11.-22.11. ; Ungerechts (Tue-Fri) ;
47 ; 22.11.-29.11. ; ;
48 ; 29.11.-6.12. ; ;
49 ; 6.12.-13.12. ; ;
50 ; 13.12.-20.12. ; ;
51 ; 20.12.-27.12. ; ;
52 ; 27.12.05-3.1.2006 ; ;
40;30.9.-7.10.;H.Wiesemeyer;HERA pool
41;7.10.-15.10.;F.Damour (7.-9.10.), M.Ruiz (9.-15.10.);VLBI (F.Damour can be contacted during his night shift)
42;14.10.-21.10.;R.Aladro (Tue-Fri), D.Riquelme (Fri-Tue);HERA pool (GISMO installation)
43;21.10.-28.10.;H.Ungerechts (Tue-Thu), A.Sievers (Thu-Tue);GISMO observations, TT NCS 27.-30.10.
44;28.10.-4.11.;R.Aladro (28.-31.10.), D.Riquelme (31.10.-7.11.); HERA-Pool
45;4.11.-11.11.;D.Riquelme (31.10.-7.11.), R.Aladro (7.11.-11.11.); MAMBO-Tests
46;11.11.-18.11.;B.Ocana; MAMBO-Pool
47;18.11.-25.11.;D.Riquelme; MAMBO-Pool
48;25.11.-2.12.;F.Damour (daytime), M.Ruiz (nighttime); ABCD-Calibrators, NCS/EMIR Tests: 24.-27.11.
49;2.12.-9.12.;F.Damour; (F.Damour can be contacted during his daytime shift)
50;9.12.-16.12.;J.Santiago; HERA-Pool (J.Santiago can be contacted during his nighttime shift)
51;16.12.-23.12.;B.Ocana; HERA-Pool, NCS/EMIR Tests: 15.12.-18.12.
52;23.12.-30.12.;R.Aladro;
1;30.12.-6.1.;H.Ungerechts;
2;6.1.-13.1.;G.Paubert;
3;13.1.-20.1.;H.Wiesemeyer; HERA-Pool, NCS/EMIR Tests: 12.-15.1.
4;20.1.-27.1.;D.Riquelme; HERA-Pool
5;27.1.-3.2.;;
6;3.2.-10.2.;;
7;10.2.-17.2.;;
8;17.2.-24.2.;;
9;24.2.-3.2.;;

AodSchedule3-08

Week Dates AoD Comments
40 30.9.-7.10. H.Wiesemeyer HERA pool
41 7.10.-15.10. F.Damour (7.-9.10.), M.Ruiz (9.-15.10.) VLBI (F.Damour can be contacted during his night shift)
42 14.10.-21.10. R.Aladro (Tue-Fri), D.Riquelme (Fri-Tue) HERA pool (GISMO installation)
43 21.10.-28.10. H.Ungerechts (Tue-Thu), A.Sievers (Thu-Tue) GISMO observations, TT NCS 27.-30.10.
44 28.10.-4.11. R.Aladro (28.-31.10.), D.Riquelme (31.10.-7.11.) HERA-Pool
45 4.11.-11.11. D.Riquelme (31.10.-7.11.), R.Aladro (7.11.-11.11.) MAMBO-Tests
46 11.11.-18.11. B.Ocana MAMBO-Pool
47 18.11.-25.11. D.Riquelme MAMBO-Pool
48 25.11.-2.12. F.Damour (daytime), M.Ruiz (nighttime) ABCD-Calibrators, NCS/EMIR Tests: 24.-27.11.
49 2.12.-9.12. F.Damour (F.Damour can be contacted during his daytime shift)
50 9.12.-16.12. J.Santiago HERA-Pool (J.Santiago can be contacted during his nighttime shift)
51 16.12.-23.12. B.Ocana HERA-Pool, NCS/EMIR Tests: 15.12.-18.12.
52 23.12.-30.12. R.Aladro
1 30.12.-6.1. H.Ungerechts
2 6.1.-13.1. G.Paubert
3 13.1.-20.1. H.Wiesemeyer HERA-Pool, NCS/EMIR Tests: 12.-15.1.
4 20.1.-27.1. D.Riquelme HERA-Pool
5 27.1.-3.2.
6 3.2.-10.2.
7 10.2.-17.2.
8 17.2.-24.2.
9 24.2.-3.2.

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)