Differences between revisions 122 and 126 (spanning 4 versions)
Revision 122 as of 2019-01-15 14:05:17
Size: 1102
Editor: msanchez
Comment:
Revision 126 as of 2019-03-13 12:17:09
Size: 1315
Editor: msanchez
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
07; 12.-19.2; A.Ritacco ( + B.Ladjelate TBC) ; NIKA2 Pool #3 ; 07; 12.-19.2; A.Ritacco ; NIKA2 Pool #3 ;
Line 18: Line 18:
11; 12.-19.3; ; ;
12; 19.-26.3; ; ;
13; 26.3-2.4; W.Kim ; EMIR & HERA Pool #4 ;
14; 2.-9.4; ; ;
11; 12.-19.3; A.Sievers ; ;
12; 19.-26.3; A.Ritacco ; NIKA2 Pool #5 + 1mm EHT/VLBI (P.Torne, 25.-26.3);
13; 26.3-2.4; W.Kim ; EMIR & HERA Pool #4 + 1mm EHT/VLBI (P.Torne, 26.3-2.4);
14; 2.-9.4; P.Torne ; 3mm GMVA/VLBI ;
Line 23: Line 23:
16; 16.-23.4; ;
17; 23.-30.4; ;
18; 30.4-7.5; ;
19; 7.-14.5; ;
20; 14.-21.5; ;
21; 21.-28.5; W.Kim;

2019

01 1.-8.1. A.Sievers (from Granada)
02 8.-15.1. W.Kim EMIR & HERA Pool #1
03 15.-22.1. B.Ladjelate NIKA2 Pool #1
04 22.-29.1. P.Torne EMIR & HERA Pool #2, 1mm EHT/VLBI Rehearsal (22.-25.1.)
05 29.1.-5.2. B.Ladjelate NIKA2 Pool #2
06 5.-12.2 G.Paubert
07 12.-19.2 A.Ritacco NIKA2 Pool #3
08 19.-26.2 W.Kim EMIR & HERA Pool #2
09 26.2-5.3 P.Torne
10 5.-12.3 B.Ladjelate NIKA2 Pool #4
11 12.-19.3 A.Sievers
12 19.-26.3 A.Ritacco NIKA2 Pool #5 + 1mm EHT/VLBI (P.Torne, 25.-26.3)
13 26.3-2.4 W.Kim EMIR & HERA Pool #4 + 1mm EHT/VLBI (P.Torne, 26.3-2.4)
14 2.-9.4 P.Torne 3mm GMVA/VLBI
15 9.-16.4 W.Kim
16 16.-23.4
17 23.-30.4
18 30.4-7.5
19 7.-14.5
20 14.-21.5
21 21.-28.5 W.Kim

Previous AoD Plans 2008-2018:

---

AodSchedule19 (last edited 2020-01-22 18:09:29 by msanchez)