Differences between revisions 1 and 117 (spanning 116 versions)
Revision 1 as of 2017-01-12 10:00:34
Size: 1551
Editor: PabloMellado
Comment:
Revision 117 as of 2018-12-05 15:28:10
Size: 963
Editor: msanchez
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
= 2017 = = 2019 =
Line 8: Line 8:
1; 3.-10.1.; P.Torne; Heterodyne Pool Week;
2; 10.-17.1.; G.Paubert (remote from Granada);;
3; 17.-24.1.; A.Sievers; Switch from mira to mrt-cal, 20.1.: 0.8mm VLBI test slot;
4; 24.-31.1.; P.Garcia; 6hours NIKA2 slot, possible 4hours 1mm VLBI slots;
5; 31.1.-7.2.; C.Marka; Heterodyne Pool Week #2, possible 4hours 1mm VLBI test slot;
6; 7.-14.2.; H.Ungerechts (remote from Granada); 10.2.: 0.8mm VLBI test slot;
7; 14.-21.2.; P.Torne; 15.2.: 0.8mm VLBI test slot;
8; 21.-28.2.; P.Garcia / A.Ritacco; NIKA2 commissioning week;
9; 28.2.-7.3.;G.Paubert (remote from Granada);;
10; 7.-14.3.;C.Marka/ A.Ritacco; 11.-13.3. A.Maury+Students;
11; 14.-21.3.;A.Sievers (remote from Granada); 16.3. IRAM Proposal Deadline;
12; 21.-28.3.;P.Garcia;;
13; 28.3.-4.4.; P.Torne; 30.3.-4.4. VLBI/GMVA 3mm Session;
14; 4.-11.4.; C.Marka / A.Ritacco; 5.-14.4.: VLBI/EHT 1mm Session and Pool;
15; 11.-18.4.; P.Torne; 5.-14.4.: VLBI/EHT 1mm Session and Pool;
16; 18.-25.4.;;;
17; 25.4.-2.5.;;;
18; 2.-9.5.;;;
19; 9.-16.5.;;;
20; 16.-23.5.;;;
21; 23.-30.5.;; End of winter semester W16;
22; 30.5.-6.6.;;;
01; 1.-8.1.; A.Sievers (from Granada) ;;
02; 8.-15.1.; W.Kim ; EMIR & HERA Pool #1 ;
03; 15.-22.1.; B.Ladjelate ; NIKA2 Pool #1;
04; 22.-29.1.; P.Torne (22.-25.1) + W.Kim (25.-29.1) ; EMIR & HERA Pool #2, 1mm EHT/VLBI Rehearsal (22.-25.1.);
05; 29.1.-5.2.; B.Ladjelate ; NIKA2 Pool #2 ;
06; 5.-12.2; ; ;
07; 12.-19.2; A.Ritacco ( + B.Ladjelate TBC) ; NIKA2 Pool #3 ;
08; 19.-26.2; ; ;
09; 26.2-5.3; ; ;
10; 5.-12.3; B.Ladjelate ; NIKA2 Pool #4 ;
Line 32: Line 20:
Old AoD Plans: Previous AoD Plans 2008-2018:

 * AodSchedule18
 * AodSchedule17
Line 42: Line 33:

---

2019

01 1.-8.1. A.Sievers (from Granada)
02 8.-15.1. W.Kim EMIR & HERA Pool #1
03 15.-22.1. B.Ladjelate NIKA2 Pool #1
04 22.-29.1. P.Torne (22.-25.1) + W.Kim (25.-29.1) EMIR & HERA Pool #2, 1mm EHT/VLBI Rehearsal (22.-25.1.)
05 29.1.-5.2. B.Ladjelate NIKA2 Pool #2
06 5.-12.2
07 12.-19.2 A.Ritacco ( + B.Ladjelate TBC) NIKA2 Pool #3
08 19.-26.2
09 26.2-5.3
10 5.-12.3 B.Ladjelate NIKA2 Pool #4

Previous AoD Plans 2008-2018:

---

AodSchedule19 (last edited 2020-01-22 18:09:29 by msanchez)