Differences between revisions 16 and 44 (spanning 28 versions)
Revision 16 as of 2017-02-08 10:20:43
Size: 1812
Comment:
Revision 44 as of 2017-10-27 08:48:15
Size: 1417
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
=== Winter semester 2016/17 ===
 
=== Summer semester 2017 ===
Line 6: Line 5:
||'''Project-ID'''|| '''PI''' || '''Institute''' ||'''Granted Hours'''||''' Friend of the Project'''||'''Status'''||'''Comments'''||
|| 100-16 || Ana Chacon-Tanarro || MPE Garching || 14.4 || || TBO || ||
|| 169-16 || Marcus Albrecht || Uni. Bonn || 6.6 || || TBO || ||
|| 185-16 || Denis Burgarella || Lab. d'Astro. Marseille || 9.8 || || TBO || ||
|| 190-16 || Helmut Dannerbauer || Inst. Astro. de Canarias || 2.4 || || TBO || ||
|| 197-16 || Ivan Oteo || Uni. of Edinburgh || 10.0 || || TBO || ||
|| 200-16 || Stefano Andreon || INAF Osser. Astro. Brera || 15.0 || || TBO || ||
|| 201-16 || Barbara Comis, Florian Ruppin || LPSC || 15.0 || || TBO || ||
||'''Project-ID'''|| '''Rating''' || '''Granted hours''' || '''PI''' || ''' Friend of the Project''' ||
|| 040-17 || A || 1.3h || Liu Yao - MPIA || H.Roussel ||
|| 041-17 || A || 8.0h || Jean-Francois Lestrade - LERMA || J-F Lestrade ||
|| 042-17 || A || 1.9h || Nicole Pawellek - MPIA || H.Roussel ||
|| 044-17 || A || 15.8h || Jose Rizzo - CAB || A.Ritacco ||
|| 050-17 || A || 11.0h || Carsten Kramer - IRAM || A.Ritacco ||
|| 077-17 || A || 3.0h || Joshua Greenslade - Imperial College, London || N.Ponthieu ||
|| 081-17 || A || 20.9h || Tony Mroczkowski - ESO || C.Romero ||
|| 082-17 || A || 15.0h || Florian Ruppin - LPSC || F.Ruppin ||
|| 083-17 || A || 15.0h || Stefano Andreon - INAF || R.Adam ||
|| 049-17 || B || 11.8h || Lin Yuxin - MPIfR || ? ||
|| 052-17 || B || 24.3h || Christopher Clark - Cardiff || X.Desert ||
|| 056-17 || B || 5.4h || Marcus Albrecht - Uni.Bonn || ? ||
Line 15: Line 19:
For these first, shared-risk NIKA2 observations in open time, a '''Friend of the Project''' is assigned to each project. This is a contact at IRAM or the [[http://ipag.osug.fr/nika2/Welcome.html|NIKA2 consortium]] to help with calibrating data and obtaining first maps by running the IDL pipeline developed by the consortium.
Line 16: Line 21:
TBO: to be observed.
DONE: project finished
ONGOING: project has started
Line 22: Line 24:
'''Go to the [[http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA2/Main| NIKA2]] main page.'''




Contact: Pablo García ([[http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA2/Main|NIKA2]] Pool Manager)

email: pgarcia@iram.es
 
Created: 2017.FEB.08, by Pablo García

Last update: 2017.FEB.08, by Pablo García
'''Return to the [[http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA2/Main| NIKA2]] main page.'''

Accepted Projects in Open Time

Summer semester 2017

Project-ID

Rating

Granted hours

PI

Friend of the Project

040-17

A

1.3h

Liu Yao - MPIA

H.Roussel

041-17

A

8.0h

Jean-Francois Lestrade - LERMA

J-F Lestrade

042-17

A

1.9h

Nicole Pawellek - MPIA

H.Roussel

044-17

A

15.8h

Jose Rizzo - CAB

A.Ritacco

050-17

A

11.0h

Carsten Kramer - IRAM

A.Ritacco

077-17

A

3.0h

Joshua Greenslade - Imperial College, London

N.Ponthieu

081-17

A

20.9h

Tony Mroczkowski - ESO

C.Romero

082-17

A

15.0h

Florian Ruppin - LPSC

F.Ruppin

083-17

A

15.0h

Stefano Andreon - INAF

R.Adam

049-17

B

11.8h

Lin Yuxin - MPIfR

?

052-17

B

24.3h

Christopher Clark - Cardiff

X.Desert

056-17

B

5.4h

Marcus Albrecht - Uni.Bonn

?

For these first, shared-risk NIKA2 observations in open time, a Friend of the Project is assigned to each project. This is a contact at IRAM or the NIKA2 consortium to help with calibrating data and obtaining first maps by running the IDL pipeline developed by the consortium.


Return to the NIKA2 main page.

AcceptedProjects (last edited 2017-12-12 10:36:22 by CarstenKramer)