##language:en #pragma section-numbers off {{{ #!CSV ;;;; 27;3.-10.7.; H.Ungerechts;; 28;10.-17.7.; M.Gonzalez; YIG Band 4 tests; 29;17.-24.7.; J.Abreu ; AMSTAR+/HEMT on-sky tests; 30;24.-31.7.; G.Bruni (C.Buchbender 27.-31.7.);; 31;31.7.-7.8.; S.Trevino ;; 32;7.-14.8.; N.Billot;; 33;14.-21.8.; J.Abreu ;; 34;21.-28.8.; G.Bruni;; 35;28.8.-4.9.; M.Ruiz/F.Damour (operators);; 36;4.-11.9.; H.Ungerechts ;; 37;11.-18.9.; G.Paubert ;; 38;18.-25.9.; I.Ruiz/E.Lobato (operators) ; Heavy Maintenance: Holo-Rx, Gearboxes; 39;25.9.-2.10.; S.Trevino;; 40;2.-9.10.; J.Abreu;; 41;9.-16.10.; S.Trevino(9-11.10)/G.Bruni(11-18.10)/J.Abreu(11-16.10); Heterodyne Pool Week; 42;16.-23.10.; M.Gonzalez/G.Bruni(11-18.10); Heterodyne Pool Week; 43;23.-30.10.; J.Abreu;; 44; 30.10.-6.11.; C.Kramer, M.Gonzalez (30.-2.11.); GISMO Pool Week I; 45; 6.-13.11.; N.Billot (5.-8.11.), G.Bruni (6.-13.11.); GISMO Pool Week II; 46; 13.-20.11.; A.Sievers; NIKA Installation; 47; 20.-27.11.; N.Billot; NIKA Week; 48; 27.11.-4.12.; J.Abreu;; 49; 4.-11.12.; G.Paubert;; 50; 11.-18.12.; N.Billot;; 51; 18.-25.12.; J.Santiago/F.Damour (operators); 17.-21. B.Lefloch with students; 51; 25.12.-1.1.2013; S.Trevino;; }}}