= 2022 = {{{ #!CSV ;;;; 01; 04.-11.01; G. Paubert; 02; 11.-18.01; A. Bongiovanni + M. Sánchez (EMIR backup); Winter NIKA2 Pool #1; 03; 18.-25.01; I. Myserlis + M. Sánchez (EMIR backup); Winter NIKA2 Pool #2; 04; 25.01-01.02; M. Rodríguez + B. Mancillas + P. Torné (EHT DR); Winter HET Pool #1 + EHT DR; 05; 01.-08.02; I. Myserlis + M. Sánchez (EMIR backup); Winter NIKA2 Pool #3; 06; 08.-15.02; A. Bongiovanni + M. Sánchez (EMIR backup); Winter NIKA2 Pool #4; 07; 15.-22.02; A. Sievers; NIKA2 pool starting a 0h of Tuesday 22nd. 08; 22.02-01.03; A. Bongiovanni + M. Sánchez (EMIR backup); Winter NIKA2 Pool #5; 09; 01.-08.03; I. Myserlis + M. Sánchez (EMIR backup); Winter NIKA2 Pool #6; 10; 08.-15.03; B. Mancillas + G. Paubert; BM on-site on Tuesday. GP on-site since Wednesday; 11; 15.-22.03; M. Rodríguez + P. Torné (EHT) + M. Sánchez; Winter HET Pool #2. EHT slot start on 17 March throughout 28; 12; 22.-29.03; B. Mancillas + P. Torné (EHT) + M. Sánchez; Winter HET Pool #3. EHT slot start on 17 March throughout 28; 13; 29.03-05.04; P. Torné + I. Myserlis; GMVA Spring session 31.03-05.04, 14; 05.-12.04; A. Sievers ; Tests of AETHRA 3mm prototype; 15; 12.-19.04; M. Rodriguez ; 16; 19.-26.04; G. Paubert ; 17; 26.04-03.05; I. Myserlis (remote AOD) ; telescope shutdown postponed to beginning of June; 18; 03.-10.05; B. Mancillas + M. Sánchez (remote); Winter HET Pool #4; 19; 10.-17.05; A. Sievers + M. Sánchez (remote); A. Sievers unavailable second half of May; 20; 17.-24.05; B. Mancillas + M. Sánchez (remote); Winter HET Pool #5. M. Rodríguez unavailable 19, 20, 21 May; 21; 24.-31-05; A. Bongiovanni; shutdown for on-site upgrade works by first June (postponed to 2023); 22; 27.05-07.06; G. Paubert; holography + wobbler tests + pointing model checks + polarimetry ToO TBC (087-21). Support from SA, PT, IM; 23; 07.-14.06; P. Torné + M. Sánchez (Tuesday afternoon); S. Amarantidis training; 24; 14.-21.06; B. Mancillas; S. Amarantidis training; 25; 21.-27.06; A. Bongiovanni; S. Amarantidis training; 26; 27.06-05.07; M. Sánchez + G. Paubert; 27; 05.-12.07; I. Myserlis; S. Amarantidis training; 28; 12.-19.07; A. Sievers; 29; 19.-26.07; G. Paubert; 30; 26.07-02.08; S. Amarantidis; 31; 02.-09.08; B. Mancillas; EMIR Pool #1 32; 09.-16.08; S. Amarantidis (Tue-Fri) + B. Mancillas (Fri-Tue); remote AOD; 33; 16.-23.08; P. Torné; remote AOD; 34; 23.-30.08; M. Sánchez (Mon-Sat) + G. Paubert (Mon-Fri), I. Myserlis (Sun-Tue, remote); 35; 30.08-06.09; A. Sievers; 36; 06.-13.09; B. Mancillas; EMIR Pool #2; 37; 13.-20.09; I. Myserlis; 38; 20.-27.09; B. Mancillas; EMIR Pool #3; 39; 27.09-04.10; S. Amarantidis; 40; 04.-10.10; P. Torné; GMVA fall session from 06. to 10.10; 41; 10.-18.10; A. Bongiovanni + S. Amarantidis (training) + M. Sánchez (EMIR backup); NIKA2 Pool #1; 42; 18.-25.10; I. Myserlis + S. Amarantidis (training) + M. Sánchez (EMIR backup); NIKA2 Pool #2; 43; 25.10-01.11; A. Bongiovanni + S. Amarantidis (training) + M. Sánchez (EMIR backup); NIKA2 Pool #3; 44; 01.-08.11; A. Sievers; 45; 08.-15.11; I. Myserlis + M. Sánchez (EMIR backup); NIKA2 Pool #4; 46; 15.-22.11; S. Amarantidis + M. Sánchez (EMIR backup); NIKA2 Pool #5; 47; 22.-29.11; A. Bongiovanni + M. Sánchez (EMIR backup); NIKA2 Pool #6. FPT test with P. Torné; 48; 29.11-06.12; G. Paubert; Holo campaign. P. Torné will join for the holo; 49; 06.-13.12; S. Amarantidis + M. Sánchez (EMIR backup); NIKA2 Winter Pool #1; 50; 13.-20.12; B. Mancillas; 51; 20.-27.11; P. Torné; 52; 27.12-03.01; A. Sievers; }}}