1 |
30.12.-6.1. |
I.Hermelo |
|
|
2 |
6.-13.1. |
C.Marka |
Heterodyne Pool |
|
3 |
13.-20.1. |
G.Paubert |
Heterodyne Pool (1x24h-Holo: Thu/Fri or Mon/Tue ?) |
|
4 |
20.-27.1. |
M.Ruiz & I.Ruiz (Operators), I. Hermelo (23.-26.1) |
NIKA prep. time (T21, 23-25.2.) |
|
5 |
27.1.-3.2. |
N.Billot |
NIKA Pool |
|
6 |
3.-10.2. |
I.Hermelo |
NIKA Pool |
|
7 |
10.-17.2. |
A.Sievers |
NIKA Polarimetry test run |
|
8 |
17.-24.2. |
N.Billot |
|
|
9 |
24.2.-3.3. |
I.Hermelo |
GISMO Pool |
|
10 |
3.-10.3. |
G.Paubert |
Pulsar observations |
|
11 |
10.-17.3. |
C.Marka |
IRAM Deadline on 12-Mar |
|
12 |
17.-24.3. |
I.Hermelo |
Heterodyne Pool (flexible 1mm VLBI) |
|
13 |
24.-31.3. |
C.Marka |
Heterodyne Pool(flexible 1mm VLBI) |
|
14 |
31.3.-7.4. |
H.Ungerechts (from Granada) |
|
|
15 |
7.-14.4. |
G.Paubert (from Granada) |
Installation of new optics |
|
16 |
14.-21.4. |
A.Sievers |
Technical & on-sky commissioning, Granada: PC Meeting on 14/15.4. + 30m visit (16.4.) |
|
17 |
21.-28.4. |
C.Marka |
Astronomical commissioning + flexible & internal pool observations |
|
18 |
28.4.-5.5. |
I.Hermelo |
|
|
19 |
5.-12.5. |
N.Billot |
|
|
20 |
12.-19.5. |
G.Paubert (partially from Granada) |
14-May: Visit of 20 students from Nijmegen |
|
21 |
19.-26.5. |
C.Kramer (19.-22.5.), F.Damour/J.Santiago (Operators, 22.-26.5.) |
Holography 18.-22.5. |
|
22 |
26.5.-2.6. |
C.Marka |
|
|
23 |
2.6.-9.6. |
H.Ungerechts (from Granada) |
|
|
24 |
9.6.-16.6. |
J.Santiago/F.Damour (Operators) |
|
|
25 |
16.6.-23.6. |
I.Hermelo |
|
|
26 |
23.6.-30.6. |
C.Kramer (23.-26.6.), C.Marka (26.-30.6.) |
22.-26.6. Heavy Maintenance: Secondary, Holography |
|
27 |
30.6.-7.7. |
N.Billot |
|
|
28 |
7.7.-14.7. |
A.Sievers (from Granada) |
11.7.: visit IRAM-OSN, 10.-13.7. 026-15 by C.Marka/F.Mirabel |
|
29 |
14.7.-21.7. |
I.Hermelo (14.-18.7), S.Trevino (18.-20.7.), G.Paubert (20.-25.7.) |
18.7.: visit IRAM-OSN |
|
30 |
21.7.-28.7. |
G.Paubert (20.-25.7.), J.Santiago/F.Damour (Operators, 25.-28.7.) |
VESPA Polarimetry |
|
31 |
28.7.-4.8. |
C.Marka |
Heterodyne Pool |
|
32 |
4.8.-11.8. |
J.L.Santaren (night time Operator) |
8.8.: visit IRAM-OSN |
|
33 |
11.8.-18.8. |
I.Hermelo |
12/13.8. Installation of M4N/M5N, 15.8.: visit IRAM-OSN |
|
34 |
18.8.-25.8. |
A.Sievers |
|
|
35 |
25.8.-1.9. |
C.Marka |
|
|
36 |
1.-8.9. |
H.Ungerechts (from Granada) |
|
|
37 |
8.-15.9. |
N.Billot |
11.-18.9. Summerschool |
|
38 |
15.-22.9. |
G.Paubert |
11.-18.9. Summerschool, 17.9. IRAM Proposal Deadline |
|
39 |
22.-29.9. |
M.Ruiz (night-time: 22.-25.9., then day-time) |
3mm VLBI |
|
40 |
29.9.-6.10. |
Operators |
NIKA2 Installation |
|
41 |
6.-13.10 |
I. Hermelo (6.-9.10.), N.Billot (9.-10.10.), C.Marka (10.-13.10.) |
Heterodyne Pool (NIKA2 cooling down) |
|
42 |
13.-20.10. |
I.Hermelo |
Part-time: NIKA2 testing |
|
43 |
20.-27.10. |
A.Sievers |
Part-time: NIKA2 testing |
|
44 |
27.10.-3.11. |
C.Kramer |
Part-time: NIKA2 testing |
|
45 |
3.-10.11. |
C.Marka |
|
|
46 |
10.-17.11. |
G.Paubert |
|
|
47 |
17.-24.11. |
N.Billot |
|
|
48 |
24.11.-1.12. |
J.Santiago/F.Damour (Operators) |
EMIR upgrade |
|
49 |
1.-8.12. |
C.Marka |
EMIR commissioning (CM, IH, AS, CK), Start of Wintersemester 2015/16 |
|
50 |
8.-15.12. |
I.Hermelo |
|
|
51 |
15.-22.12. |
G.Paubert (partially remote from Granada) |
|
|
52 |
22.-29.12. |
Support is provided partially remotely from Granada: H.Ungerechts (22.-24.12.), F.Damour/I.Ruiz (Operators, 25.12.), H.Ungerechts (26.12.), C.Marka (27.-28.12.) |
|
|
53 |
29.12.-5.1. |
C.Marka |
|
|