AodSchedule111
Week
Dates
AoD
Comments
51
28.12.2010-4.1.2011
J.Abreu (J.Santiago, night-time-operator)
restart of HERA pool on Friday 7.1.
1
4.1.2011-11.1.
C.Buchbender (M.Ruiz, night-time-operator)
HERA pool week
2
11.1.-18.1.
M.Gonzalez
HERA pool week
3
18.1.-25.1.
G.Quintana-Lacaci (18.1-21.1)/J.Abreu (21.1-25.1)
MAMBO pool week
4
25.1.-1.2.
H.Ungerechts
5
1.2.-8.2.
G.Paubert
6
8.2.-15.2.
G.Quintana
MAMBO pool week
7
15.2.-22.2.
M.Gonzalez(15.2.-17.2.)/A.Sievers(18.2.-22.2.)
HERA pool week
8
22.2.-1.3.
J.Abreu
MAMBO pool week
9
1.3.-8.3.
M.Gonzalez
HERA pool week
10
8.3.-15.3.
D.Riquelme
11
15.3.-22.3.
J.Abreu
Reserve pool week
12
22.3.-29.3.
C.Buchbender
NCS tests 21.-24., New continuum backends, VLBI@1mm fringe test 25.-28., 228-09
13
29.3.-5.4.
D.Riquelme (29.3.-1.4.)/ M.Gonzalez (1.4.-5.4.)
VLBI@1mm
AodSchedule111 (last edited 2011-05-06 07:54:18 by
lt-ck
)